Ref. No. : CA - 14226 - (Production - Extrusion – with 15.3 years in Plastic Industry)

Education

Three Year Diploma in Plastic Technology from Institute of Petrochemical Engineering, lonere in 2010 - 2011

SSC with 67% from Mumbai University

Skill Sets

Computer Platform
MS - Word, MS - Excel etc

Work Experience

Process Enginner In Blown Film Department
Since Oct 2013
Company Profile: Leading group in Tube Laminate And Lamitube manufacturing for Toothpaste, Pharmaceuticals, and Cosmetics etc. .
Job Profile:
Handling 2 Nos of 3 layers Reifenhauser co-extrusion (Reifenhauser &
RU0300182, RT-681 machine delivering the output of 600kg/hr.
Worked in SAP environment.
Overall responsible for the Quality and Productivity of the products.
Job involved, day-to-day production planning of machine.
Carrying out breakdown and preventive maintenance of machine.
Handling manpower, In-house planning of the dept.
Leading the several Project of Blown Film Department by applying 6 Sigma Tool
Support to solve Quality Issues & Internal complaints.
Support with vendor development activities.
Attending customer complaints, Root cause analysis and establishing Action Plan for controlling and solving the problems. (CAPA)
Tracking and Updating of Dept Objectives for Monthly Presentation.
Preparing and Reporting of Production, Stock, and RM Reconciliation for MIS.
SAP system transaction, Raw Material reconciliation and data analysis through SAP.
Preparing and Updating documents for various manufacturing, Process and Safety
Review e.g. GMP, HMP, and ISMS etc.
Coordinating in C & I or R & D trial for New Product Development and keeping tracking records.
Establishing and Maintaining good house keeping by 5S technique
To train juniors, new joiners and workers e.g. Safety awareness, housekeeping, team working

Production Supervisor
June 2010 to January 2013
Company Profile: An ISO - 9001 : 2000, BRC - IOP : 2004 & HACCP System equipped company. This is leading group in flexible packaging.
Job Profile:
Trouble Shooting solution.
Analysis of wastage, project for reducing wastage.
Project for increasing out put and efficiency of plant at same overhead expenses.
Manpower utilization and motivation and improving their effectiveness.
New job setting.
Process control parameters observation.
Planning for minimizing wastage, increasing productivity & improving quality.
M/c. Preventive Maintenance.
Maintain System in department and documentation.
Commercial calculation for department.
Budget formation for department.
Department cost reduction by machine utilization, manpower, new raw material introduction.
Special Achievements:
Solved creases problem by modification of ‘A’ frame.
Flappiness problem by modification of Winder.
Lamitube job setup & maintaining good quality.
Special Training:
Fire Fighting Training
5 S Training.
Presentation Skill Training
6 sigma Training

Experience With Machines
Windmoller Holscher7-layer (Germany) Max. Lay Flat width 1650 mm, L/D. ratio - 30:1.
DGP Windsor (Khune) Max. Lay Flat width 1600 mm, L/D. ratio 30:1.
Refinhauser Three layer plant having max Output - 600 kg hr, max lay flat width 2500mm.
Brahmton Engineering& Mamta Brahmton engineering 5 layer (Die rotation & platform rotation).
Alpine m/c of 3 layer IBC

Material Handle:
LDPE, LLDPE, HDPE, MDPE, Inomer, Dow Inspire base resin, PP, Acid copolymer etc.

Future Goals

To obtain a challenging position in Dynamic Team environment that will provide an opportunity for professional growth and further enhance skill and proficiency for career growth.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com