B.Tech in Electronic & Communication. Engg. (Production) from Shivdan Singh Institute of Technology & Management affiliated to U.P.T.U. LKO. In 2010 with 63.4% Marks
10+2 (P.C.M.) from S.V.M. Inter College, Kasimpur Power House (Aligarh), Affiliated to U.P.Board in 2003 with 70.50% Marks
10th (Science Group) from S.V.M. Inter College, Kasimpur Power House (Aligarh) Affiliated to U.P.Board in 2001 with 71.30% Marks
Strong Point:
Strong Interpersonal Skills.
Quick learner.
Can work under challenging environments with lesser guidance.
Operating system - DOS, MS Office, MS Word, MS Excel Language - C, C++
Industrial EMBEDDED Engg. Course.
Shift Engineer Process
Since Aug 2013
Company Profile: Manufacturer of Polyester Films
Job Profile:
Process 6.5 Mtr. fully manual Donier line (BOPP) Manufacturing film 12 to 40 micron
Shift Engineer Process
July 2011 to Aug 2013
Company Profile: Manufacturer of Polyester Film, PET Films, Metallized Polyester Film, Holographic Film, Holography, etc
Job Profile:
8.7 Mtr. fully Automatic Bruckner line (BOPP) Manufacturing film 10 to 45 micron
Coordinate B.S.S. Engg.
June 2010 To April 2011
Company Name: Air Network Solution
Job Profile:
Ensuring 100% availability of machine for production purpose.
Capable for handling manpower.
100% effort for achieving target production.
Looking after activities for I.S.O. Production Department.
Breakdown analysis for achieving zero break- down in future.
To keep track on inventory and spare consumption.
Planning of shutdown jobs to achieve planned preventive Maintenance.
Coordinating with maintenance people.
For the purpose of modification of existing machine.
Make Special Type Film:
Nine, Ten & Twelve Micron, White, Pearl, Matt, Thermal Coating
Industrial Training
45 days Vocational training completed from B.H.E.L. Haridwar (U.K.)
Seminar Delivered
IDF, MDF, No of Shifting & No of Closing.
Project Work
Title: Automatic RF Based Land Rover Role: Hardware Work In Project
Project 1
Work in project from Civil Time.
Good knowledge about Auto Levle & Thedo Level.
Work in project of Bruckner Bopp with German Engg.
Knowledge in Ericson & Commissioning of Bopp Bruckner 8.7 Mt. line.
Good knowledge about Extruder, EREMA, MDO, PRS and other machine installation and its alignment.
Good knowledge in troubleshooting.
Good knowledge about civil drawing and machine installation Drawing.
Good knowledge about SCADA operation in control room.
Knowledge about recycling plant (EREMA) operation and Troubleshooting.
Able to do plant start up & shutdown process.
One month analysis done on RIPPLE.
Project 2
Work in project of Dornier Bopp with German and France Engg.
Knowledge in Ericson & Commissioning of Manually Bopp Dornier 6.5 Mt. line.
To attain new heights and to face new challenges
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com