B. Tech Polymer from College Of Engg & Technology, Akola, Amaravati University in 2009 with 69.76%
Diploma in Plastic and Polymer from Govt. Polytechic College, Amaravati, in 2006 with 60.93%
Injection molding machine as well Compounding
Production Engineer
Since Feb 2012
Company Profile: Largest manufacturer of electrical and telecommunication cables.
Job Profile:
Handling two BUSS machine extruder for master batch manufacturing different grades of cable compounds.
Handling high speed mixers for making dry blends of different grades.
Making formulations for different grades of cable compound.
Arranging raw material as per requirement for the grades.
Man power arrangement as per requirement.
Solving technical problems occurs during the time of production.
Attention towards health and safety programs.
Attention towards the pollution free environment
Production Engineer
June 2010 to Jan 2012
Company Profile: Manufacturer of Plastic and PVC PU Products, Plastic Raw Materials.
Job Profile:
Planning, monitoring, M/C shop production, tool management, manpower handling, work distribution, handling shift production activities. Well aware of operating & setting in M/C shop.
Preparation of daily /weekly /monthly reports, MIS report and presenting the same, collating information on the process sheet of production and testing and submitting to head of the department.
To Increase Yield of Machine & manpower by setting optimum cycle time.
Trouble shooting during process of product manufacturing .conducting preliminary checking of dimension, gauge checked & by fitment checking.
Supervised marketing department for purchase of equipments and materials for production to meet the standard of industry
Timely reporting to senior production manager about execution of plans and records maintained for effective production.
Parameter setting for new product as will as planning of new mould setting on m/c .
To solve & analysis customer complaint by evaluating man, machine, material, tool & process.
Provides schedules and shifts for factory workers depending on need and production quota.
Machine Handled:
Ferromatik Milacron 75 Tons (350 tons) (5 m/c), Windsor 350 Tons (3m/c)
Mould Handled:
Hot runner moulds, 2plate & 3plate moulds, with various cores.
Material Handled:
PC, PP, ABS, HDPE, etc
Production Engineer
June 2009 to May 2010
Chirag Pack India Pvt. Ltd
Job Profile:
Planning, monitoring, M/C shop production, tool management, manpower handling, work distribution, handling shift production activities. Well aware of operating & setting in M/C shop.
Made budget and time management plans to achieve target.
Trouble shooting during process production.
Supervised marketing department for purchase of equipments and materials for production to meet the standard of industry.
Timely reporting to senior production manager about execution of plans and records maintained for effective production.
Investigation of supply of raw materials
Timely checking of production by dimension & visual appearance.
To solve & analysis customer complaint by visiting there plant or online assembly.
Parameter setting for new product as well as planning of new mould setting on m/c.
Machine Handled:
L & T 100-250 Tons (7m/c), Hand injection molding machine.
Mould Handled:
2plate & 3plate moulds, with various cores.
Material Handled: PC, PP, ABS, HDPE, PMMA, DURLIN, PS etc
To achieve the goal by using high-level accuracy. To finish the task in legitimate time. To complete the work assigned single and with team members in professional manner.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com