Ref. No. : CA - 17537 - (Maintenance and Service - Electrical – with 11.6 years in Plastic Industry)

Education

Diploma in Electrical Engineering Haryana State Board Of Technical Education, Govt. polytechnic Manesar, in Year 2010 to 2013 With 62.7%

Bachelor in Technical Education, The iNstitution Of Engineering (India), AMIE in Year 2014

12th From Board of Haryana Open School in Year 2013 With 49.8%

10th From Happy Model Sr. Sec. School, Haryana Board Of Secondary Education in Year 2009 to 2010 With 81.2%

Skill Sets

Technically competent Electrical Engineer gratifying career span of 2.5 years in the Project Management, erection, testing & commissioning of 11KV Substation/Electrical Equipment, Electrical Quality Check, erection of Coal handling plant in coal fired thermal power plant (30MW), Preventive/Predictive Maintenance, PLC programming(fault finding and troubleshooting), Standard Execution and Quality, Environment, Health & Safety compliance.

Work Experience

Electrical-Executive
Since September 2014 
Company Profile: 30 MW coal fired thermal power plant
Job Profile:
Overall Responsible For Complete Modification And Validation Of Electrical Drawing Of Coal Handling Plant. 
Prepare Full Kitting Of Coal Handling Plant For Complete Erection Against Time. Prepare Bill Of Quantity (Boq) For Coal Handling Plant. 
Complete Erection, Testing & Commissioning Of Coal Handling Plant(flow Rate 210tph And Partially Working In Erection Of Dm Plant(flow Rate 110m3/h). 
Responsible To Ensure The Quality Of Project Installation, Prepare Energizing And Testing Report Of Electrical Equipment. 
Erection And Commissioning Of Fire Alarm System. 
Responsible For Testing And Commissioning Of Mcc Panel And Earthing System

Previous designation:
Electrical-quality In-charge
Job Profile:
Overall Responsible For Complete Design & Modification And Validation Of Electrical Drawing
Complete Erection, Testing & Commissioning Of 2.5 Mva Transformer.responsible To Ensure The Quality Of Project Installation, Prepare Energizing And Testing Report Of Electrical Equipment. Erection And Commissioning Of Fire Alarm System. Responsible For Testing And Commissioning Of Transformer, Ht Panel, Lt Panel, Capacitor Bank, Earthing. Identification And Implementation Of Kaizen In Over Shop Floor.
Follow Tpm Mythology Of Z Bad (Zero-breakdown, Accident, Defects).

Diploma engineer trainee 
From July 2013 to September 2014
Company Name: Asahi India Glass Ltd
ob Profile:
Responsible as control in charge of a highly automated CNS Lines and Furnaces. Responsible for Reducing Total downtime of my area through Preventive/Predictive Maintenance activities.
Responsible for Machines Periodical Maintenance and Breakdown Maintenance. Responsible for TPM and 5S activities. Identification and Implementation of Kaizen and Poka-yoke. Responsible for Planned Improvement Projects as per production requirement.

Major Activity:
Project of 75 TPD Capacity Textile unit for Bed-sheet with two indoor type 11kV substation equipped with Schneider Electric HT Panels, LT, MCC, LPDB, MLDB, APFCR, UPS Panels etc.

Future Goals

,,,,,,,,,,,,

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com