Ref. No. : CA - 7589 - (Production Planning - Plastic Products and Processing – with 19.5 years in Plastic Industry)

Education

Post Graduate Diploma in Plastic Processing and Testing from CIPET, Bhopal in 2010.
B.Sc from Dr.R.M.L Avadh University, Farizabad, U.P with Second Class in 2008.
12th from U.P.Board, Allahabad with First Class in 2005.
10th from U.P.Board, Allahabad with Second Class in 2003.

Skill Sets

Computer Proficiency:
Basic Knowledge of computer.

Work Experience

Shift In Charge- Production
Since Jan 2012
Company Profile: Manufacturer & supplier of PET- Bottles, Jars & Preform, having Nissei ASB & Husky Injection Molding Technology.
Job Profile:
Maintenance of Machine Preventive & Breakdown maintenance of Husky injection molding machines & ASB.
Conduct Mold Change over & Trials.
Ensure smooth and trouble free operation of PET Preform & bottles.
Monitor process and quality parameters.
Troubleshooting and corrective action wherever required.
Maintenance, operating and breakdown troubleshooting of Drying system & Dehumidifier
Maintenance coordination for planned and preventive maintenance.
Manpower deployment and planning for leaves and rotation in shifts.
Ensure safety and industrial hygiene in maintenance and production activities.
Initiate proper start up and shut down activities for planned and unplanned shutdowns and start ups.
Quality inspection as per standards.

Production Engineer
Aug 2010 to Dec 2012
Company Profile: Manufacturer of containers using EBM, IBM, ISBM & IM and closures using IM.

Production Engineer
Aug 2009 to Aug 2010
Company Profile: A.G. Peripherals.

Machine Handling:
Injection moulding: L&T up to 850 Ton, TRX up to 1800 Ton, Feromatic up to 250 Ton, Cosmos up to 200 Ton, Zafir up to 250 Ton, Hixing up to 200 Ton
Hiten up to 200 ton, Rasa up to 200 Ton.

Advance Injection moulding
Hypet-120 Husky.
Blow Moulding
ASB-50 MB (V3).

Projects:
Assembly & installation of 68 Nos of injection moulding machines (TRX).
Handling a new project of HUSKY HYPET 120 & preform manufacturing injection moulding plant as a Production Engineer and successfully installation and running.

Future Goals

To become a Manager.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com