Ref. No. : CA - 21334 - (Production - Moulding – with 11.4 years in Plastic Industry)

Education

Pursuing B.Tech in Mechanical From AMIE, Kolkata in 2014-2018

Diploma in Plastics Technology Processing & Testing From CIPET, Hyderabad in 2013 with 70%

H.S.C From Bihar Board in 2010

Skill Sets

03 years of dynamic experience in the field of Automobile Industries which includes Production & Process setup of Plastics automotive parts.
In Process &Production Engineering having 03 years of hands on experience
Specialized in Production, Rejection reduction & Process setup,
Good Knowledge in Shop floor handling,
Specialized in Manpower handling & Material Handling for injection molding,
Good knowledge for new mold trail & Process setup
New comer training,
Playing important role in plan making for production,

Windows XP/Vista/7/8
MS-Excel, PowerPoint, word
Empro
Familiar with the working on Internet

Work Experience

Technician - Molding shop & Process Engineering
Since Jul 2013
Company Profile: manufactures a wide range of plastic components for the automotive and the non-automotive industry. Within the automotive industry, the company is one of the largest manufacturers of exterior rear view vision systems in the world and is one of the largest manufacturers of IP modules, door trims and bumpers in Europe. Provides an end-to-end range of design and manufacturing solutions to the automotive customers, including product concept and product design, engineering, manufacturing, sub-assembly and the production of integrated modules
Job Profile :
Shop floor handling, Manpower handling, Material handling, Production planning,
Part moment, Online assembly, 
DIS closing, SMP revised, Problem solving with 7QC tool, Audit Document
Cycle time reduction, Rejection reduction, increase Efficiency & Utilization
New comer training, 5S maintain
Assembly Feasibility & Process Flow,
Process set up for new mould, 
Process & Time study for moulding process,
New mold trail/Analysis

Support to Maintenance, Tooling, Planning & Quality Development team
Supporting during PM, and analysis the problem,
Define tooling problem.
During plan making playing a big role for PPC team,
Part running as per required Quality standard.

Project Handled
Handled  project B376, B517, B515 mould  trail for FORD .
Increase of Productivity & reduction of part weight in scientific molding
Reduction of Mould change time using Quick mould change system.
Implementation of one man 2machines concept.
Standardization of Mould & machine for its auxiliary equipments (Locating Ring & Cooling nipples).
Reduction of mould change over time by allocating Specific machine for specific products.
To identify the root cause of problem through 7QC tools for reduction the rejection.

Overall Training Undergone
7QC Tools, TPM, 5S, Kaizen, I Do I Check, 6R
                                                  
Material Handling
PP, ASA, ABS, Nylon, PC

Knowledge About Robot
Robot setting
Easy robot operate
Robot jig change
Able to solve small problems

Tool Handling
Scale, Spanner, Screw Driver, Vernier Scale, Multimeter, Bench Vice, File

Academic Project
College: CIPET Hyderabad
Team size: 6 member
Project Name: Fabrication And Processing Of Glass Mould By Thermoforming

Future Goals

To be associated with a professional organization contributing myself to the Production Process, & Technological excellence of the company through long term mutual relationship

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com