Ref. No. : CA - 12441 - (Production - Extrusion – with 15.3 years in Plastic Industry)

Education

PG Diploma in Plastic processing & Testing From C.I.P.E.T, Amritsar having credential With 71% “B” Grade

B. Sc From M.D.S University, Rajasthan having credential With 51% 

Skill Sets

Nearly 4  years of experience in pipe extrusion (u-PVC / HDPE) at
Line Operation & Quality assurance
Tool set up & Trouble shooting. 
Product Trial Run on the shop floor. Pre & Post trial assessment 

Two years Advance diploma in soft ware technology from CMC Ltd, Kota

Work Experience

Line Operation & Quality assurance
4  years of experience
Company Profile: Pipe manufacturer
Job Profile:
Pipe extrusion (u-PVC / HDPE)
Tool set up & Trouble shooting. 
Product Trial Run on the shop floor.
Pre & Post trial assessment 


Cost Reduction:
Continuous improvement initiatives in processes( eg.pipe meter weight reduction, pipe length control)
Implementing strict measures in operating procedures to optimize resource/ capacity utilization.
Regrind use (2 times)

Quality Assurance:
Identifying areas of quality failures and taking steps to rectify the system.
Practicing quality standards with key emphasis on improving quality.

Production Planning & Control:
Minimizing performance bottlenecks for achieving high productivity with minimum consumption of material & machine and monitoring expenses.
Handling operations for improvement in existing products.
Establishing new set ups thereby bringing profitability to the company

Man Management:
Shift management of team size 10 members ensuring positive contribution in operations & productivity.
Imparting training to various personnel’s, thereby ensuring optimum performance.
Determining the manpower requirement in accordance with the manpower rationalisation & production norms.

The Role & Responsibility:
Shift in charge.
Planning of shift activities & allocation
Material & machine planning
Production and quality assurance for the HDPE & rigid pipe
Shift reporting, production declaration, Handover of machine conditioning & area 5S
Corrective and preventive actions for any deviation in process
Recycling of process wastage & storage.

Future Goals

Seeking assignments in Production process

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com