Awaiting MBA results, specialization in Human Resource and Marketing, from Bangalore University, Karnataka, India.
Master in Engineering Science (Mechatronic Engineering) with First Class at The University of New South Wales, Sydney during February 2005 to February 2006.
Course work: Artificially Intelligent Machines, Industrial Robotics, Digital logic Fundamentals, Machine Condition Monitoring, Factory Automation, Microprocessor Fundamentals, Computer Integrated Manufacturing, Modelling and Control of Mechatronic Systems.
Bachelor of Engineering from Visveshwaraiah Technological University, Karnataka during September 1999 to July 2003 securing first class with distinction.
Electives: Theory of Elasticity, Theory of Plasticity, Finite Element Methods, Tribology, Vibrations, Control Engineering and Computer Graphics.
Windows, Microsoft Office, AutoCAD, CAM, IDEAS, NISA, SOLID EDGE V12, MATLAB, Rapid programming, CATIA, fundamental knowledge of C-programming.
PROJECTS:
FOURTH SEMESTER MBA PROJECT
Duration: March 2005 to May 2005
Place: Bangalore, Karnataka, India
Team Size: Individual.
Description: The influence of promotions on the customer buying behaviors for color television the customer interests, needs, the influence of advertisements on their buying behaviors.
THIRD SEMESTER MBA PROJECT
Duration: July 2004 to September 2004
Place: Solar Automobiles INDIA Pvt. Ltd., Bangalore, Karnataka, India
Team Size: Individual.
Description: A study on Customer Care the customer interests, needs, satisfaction level of the passenger car (Maruti Udyog Limited vehicle) & the servicing rendered at the servicing center was studied and analyzed.
EIGHTH SEMESTER B.E PROJECT (FINAL YEAR PROJECT)
Duration: March 2003 to June 2003
Place: Hindustan Aeronautics Limited, Bangalore, Karnataka, India
Team Size: 4
Description: Design of uplock for a light transport aircraft designed the component which holds the landing gear of an aircraft in locked position and unlocked position during take-off and landing using AUTOCAD
SIXTH SEMESTER B.E PROJECT (MINI PROJECT)
Duration: April 2002 to July 2002
Place: B. M. S. College of Engineering, Bangalore, Karnataka, India
Team Size: 4
Description: Testing of a 4- stroke Internal Combustion Engine under various pressure and temperature conditions.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com