1 B. E. (Plastic) (L. D. College of Engg. A’bad)
2005 GUJ. 3rd 61
2006 GUJ. 4th 55
2006 GUJ. 5th 76.70
2007 GUJ. 6th Continue
2007 GUJ. 7th -
2008 GUJ. 8th -
2 Diploma in Plastic 2004 TEB Final 76
3 S. S. C. 2000 GSEB 10th std. – 64
Training during Diploma:
2003 - MUTUAL MECAPLAST LTD. - Duration: 6 months
MUTUAL MECAPLAST LTD. has a wide range of injection molding machines producing engineering plastic products.
2004 - FERROMATIK MILLACRON INDIA (PVT) LTD. - Duration: 6 months
manufacturers of a wide range of injection molding machines.
Trainng during B.E:
2006 NEOPLAST ENGINEERING PVT. LTD. - Duration: 3 weeks
They manufacture high-speed mixtures, conical twin-screw extruder for PVC compounding & processing, lab equipments & underwater palletizing system
WORK EXPRIENCE:
2005 - FERROMATIK MILLACRON INDIA (PVT) LTD. -Duration: 7 months
FERROMATIK MILLACRON INDIA (PVT) LTD. manufacturing of wide range of injection molding machines.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com