PGD-PPT (Post Graduate Diploma in Plastic Processing & Testing ) from CIPET (Central Institute of Plastics Engineering and Technology) Hajipur with 90.28% in 2010-12.
BSc. (Chem) Examination from JPU Bihar University with 73.4 % in 2010.
Higher Secondary Examination from Bihar Board with 55.6 %in 2007.
Secondary Examination from Bihar Board with 62.4% in 2004.
Software Knowledges:-
Office Automations : MS-Word Excel, Internet, Networking, MS- Office, Power Point, EMPRO.
PRODUCTION IN-CHARGE.
From 05 February 2015 to Till.
Company profile-ISO company in House hold & food packaging field for plastic parts manufacturing.
Job profile-
Injection & Blow moulding process:-
Process setting.
Trouble Shooting.
Process validation
Man power handling.
Robot setting.
Red Bin analysis.
Daily production calculation.
Maintaining 5S activity in Shop floor & Kaizen work.
Process standardization and parameter monitoring.
Taking trial on new moulds & materials
Assisting and coordinating Vendors and Quality Department for quality issues.
Carry out preventive maintenance on molds
Planning for mold change & breakdown maintenance.
IN QA FPA-LPA , SPC, GAP & FLUSH.
Moulding plan as per customer requirement.
Inventory control.
Material planning based on consumption and forecasting required for feeding customer production line.
Optimum utilization of resources to achieve less production cost.
Continuous focus on Cost Saving which helps to increase Profitability of an Organization.
Manage the daily production activities of the team members.
Report technical deficiencies to eg maintenance/IT department
Set-up and manage filing system for all department related documents
Control, follow-up and adjust the production process and contribute to continuous improvements within the department.
Assistant Engineer
Since August 2011 to 31 January 2015.
Company Profile: A multinational company in automobiles field for plastic parts manufacturing.
Job Profile:
In Production:
Working as production shift supervisor.
Manpower Handling .
Remedies of troubleshooting during part moulding on m/c.
Daily production calculation & entry.
Maintaining 5S activity in Shop floor & Kaizen work.
Document work
In Quality Assurance:
Q Assurance in production
FPA & LPA
Gap & flush
Testing of MFI
SPC
APQP
Training:
Training of Maintaining 5S.
Training of First Aid.
Training of MS office.
Training of TPM.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com