SSC passed in March 1996 from Auragabad board with 44%
ITI [ ELECTRICIAN ] passed in 1998 from delhi board with 73 %
HSC passed in feb 1999 from Auragabad board with 52%
Appear diploma in plastic engineering from Aurangabad
Technician
Working Experience On Blow Moulding Machine
Good Operating & Maintenance Knowledge Of All Beverage Releted Machine (Filler, Labeller, Unscramble, Case Packer, Coder)
PROFESSIONAL SYNOPSIS
A hard working professional with over 7 year of rich knowledge of production management & maintenance skills.
CARRIER HIGHLIGHTS
Presently working at a leading company in Aurangabad as high skill Blow Moulder Technician. Since Jun 1999 to till date.
Good operating knowledge of all kind of beverage related machinaries.
Proficiencies in maintenance operations with proven abilities in reducing downtime and enhance in operation efficiencies of the same by using TPM, Why-Why Technology.
For Example –Modify in base-mold assembly & reduce downtime of m/c so that m/c run with 100% efficiency & worth Rs. 3.96 Lacs, which quotation was given by sidel.
Working Experience On Blow Moulder Machine
SBO 4 CSD-series 2 – Sidel
MAG Plastic –Mag
SBO 8 CSD –series 2 –Sidel
SBO 4 HOT FILL series 2 -Sidel
SBO 8 HOT FILL series 2+ -Sidel
SBO 8 UNIVERSAL –CSD & HOT FILL –Sidel
Contribution at comissining of all above mentioned machines
Capable to make all pack size recipes, HR & CSD blow molders
Working on all breakdown and preventive maintenance of machine like, 6000 hrs and 12000 hrs.
Size change –over and total settings of machines as per size, like -500ml, 600ml, 1ltr, 1.2ltr, 1.5ltr and 2 ltr.
Specially traning by sidel for PET, HR and HR Universal.
Capable to stop the entries by sidel guids guys in our premises for maximum extended.
ACHIEVMENTS OF LAST THEE MONTHS
Universal b/m SBO 8 (HR) water rotary union replaced
SBO 8 (HR) series2+ water rotary union repaired
SBO 8 ( CSD ) series 2 6000 hrs maintenance
a) Nozzle cylinder repair kit replaced
b) Stretching cylinder repair kit replaced
c) Mold locking cam repaired
d) All mold compensation system modified
e) Break unit servicing
f) All belt tensioner roller bearing changed
PRODUCTION & PROCESS ENGINEERING & QC
Capable to give better output by lower manpower, material, machinary, components. for achieving optimum levels.
Perfect knowledge of enhancing efficiency by implementing some simple and basic fundaments.
Better ideas to impove quality standards across various processes to reduce rejection levels and ensure high quality standards at the all stage of production.
To work in an transparent and dynamic high growth oriented organization,where I can use my skill and knowledge in Production ,Process Engineerings and improvement maintenance and quality assurance in transforming the business objective of the organization in firm relation
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com