Ref. No. : CA - 3922 - (Designer & Product Developer – with 19.5 years in Plastic Industry)

Education

B.E. Instrumentation from Parshvanath College of Engineering, Mumbai in May-2005
with 67%
H.S.C.( XII) Science from Patkar Junior College, Mumbai in June-2001 with 67%
S.S.C.( X) from Dr. T. R. Naravane High School, Mumbai in June-1999 with 84.26%

Skill Sets

DCS, PLC and Visual Basics 6.0, C, C++ & DCS

Work Experience

Project Engineer
Since May 2006 till Present.
Presently working with a leading company on Plant Design software maxDNA (Ver.4.2.1 onwards), max1000 plus software.

Projects- Gujrat Narmada Fertilizer Company Ltd. Gujarat: DCS Upgradation Project
Implementation of Logic, Closed loop Configuration, Open Loop Configurations using the maxDPUTools.
Completed site commissioning of project successfully.

Projects- Rehabilitation Naghlu Hydro Power Plant Naghlu, Afghanistan: Supervisory Control and Monitoring using maxDNA.
Carried out FAT (Factory Acceptance Test) successfully at staging site of Metso Automation at Dombivali.
Preparation of Bill of Material (BOM) and I/O Interconnection Wiring List.
Preparation of Graphics Design Philosophy (GDP).
Calculation of AC and DC power calculation for UPS rating requirement as per the power consumption of each Module of DCS and other monitoring devices. Preparation and modifications of Plant and Control Room layout diagrams, General Arrangement and Internal General Arrangement drawings, Cabinet Layout and Network Architecture drawings in AutoCAD.
Logic Implementation using tagnames given by the Customer in the maxDPUTools.

Projects- ARL Jankusawa Hydro Power Plant Malaysia: Upgradation of HMI from max1000 plus system to Version max 4.3.1
Preparation and replacement of old displays and related logic by newer version max 4.3.1.
Performed EAT (Engineering Acceptance Test) successfully with the Customers Appreciation and Satisfaction.

Projects- NTPC Rihand & Ramagundam: Graphics Interface
Preparation of Graphics of whole Power Plant using software maxVUE Editor and maxVUE Runtime.
Simulation of Graphics and virtual testing of Graphics using maxTOOLS (DPU 4E/F)

Projects- GMR Power Plant Taneer Bawi, Chennai: Performance Calculation
Preparation of Performance Reports and Shift Summary Reports using the standard Metso Automation Performance Calculation Package (maxCALCS) to perform miscellaneous calculations for the devices like boilers and turbines etc.
Calculated results can be displayed in Trending, Logging, Alarming, and Graphic Displays.

Junior Electronics Engineer
Since September 2005 to May 2006
Worked with Electronics Measurement and Controls, Mumbai
Tasks undertaken were Testing, Calibration, Repairing & Designing of own EMC PLC cards, counters used specially for Plastic Injection Molding plants such as Montex in the ink filling area.
Special Task: -
Performed Project Management tasks such as calculation of man Hours used in Projects, Preparation and monitoring of Project Schedule Activities as per timesheet and submission of monthly report to Finland accordingly.

Future Goals

A decisive role in growing organization where optimum utilization of my knowledge for encompassing execution of various complex projects sprade across various technologies in the automation & Instrumentation industry can give tangible benefits to the employer.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com