Diploma in Tool Die Making from Central Tool Room Training Centre, Bhubaneswar (An Indo-Danish Tool Room having ISO 9001 ISO 14000 certified) (equivalent to Mechanical Engineering) passed out in the 2004 with 76.8%.
Mould Maintainance
Mould Maintenance Engineer
Dec 2006 to Till Date
Presently working with a leading mold making company.
Responsibilities:
Handling new projects
Monitoring mould maintenance & Major mould modification
Industrial Trainee Engineer
May 2003 to May 2004
Company: Sridevi Tool Pvt. Ltd
Responsibilities:
Handling new projects
Monitoring mould maintenance
Worked in CNC milling machine DMC 63V, DC 70V, Sanrocco MEC 120 centre
DMC 63V – controller sunumeric
DC 70V – Dialog box controller
Sanrocco MEC 120 centre – Selca 3045 controller
Software Proficiency:
AutoCAD R14 & 2000 (2D Drafting & 3D Modeling)
Pro / E – 2001 (Solid Modeling Assembly & Drafting)
PROJECT
Project: Car Trim Door. Left & Right Side
Client: FORD company
Duration: Dec 2006 till date
Description: The mould maintenance. Having the Assembly and ejector pin assembly
and hydrolic working system and cooling system. And testing hot
chamber, hot runner. multi value. Having the output by Try out of the
ariticle.
Contribution: As a core team member my role was Preparation of activity charts for mould made in previous article ground.
Development of all the output. Come by Tryout in the ariticle
Development of all moulds assembly
PROJECT
Project: The mould of glove inner Box (comic India)
Client: Tata Plastic Pvt. Ltd System, Pune
Duration: May-2005 to Nov-2005
Description: The mould maintenance. Having problem in Article. Giving solution like
Spring actuation, ejection in the article is in contact. The pin having a
(flash), the HRS having leakage of material. Assembly of the mould.
Contribution: As a team leader my role was Preparation of time live chart for mould made outside.
Coordinating team members.
PROJECT
Project: Manufacturing Samsonite mould
Client: Samsonite company
Duration: Nov-2004 to Feb-2005
Description: Operator in CNC milling machine worked in DMC 63V and DC 70V
and Sanracco machine
Project
Project: Worked CTTC Bhubaneswar as a mould maintenance, cap mould 8 impression mould.
Client: IF –tech company
Duration: Nov-2004 to Feb-2005
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com