• Bachelor of Science in Chemical Engineering (with spec in Polymer) 1st Div 2002 – 2005, University of Engineering & Technology, Lahore, Pakistan
• F.Sc Pre Engineering, 1st Div. 1999 – 2001, Govt. College Of Science Lahore, Pakistan.
• Matriculation 1st Div., 1998 – 1999, Divisional Public School, Lahore.
Errection and commissioning of extrusion lines for the manufacturing of PE and PPRC pipes with automatic weight and thickness controller.
Shift Engineer in Lahore
Since - 2006.
Key player for setting up the project with Polyethylene and Polypropylene Pipe manufacturing facility.
Duties & Responsibilities:
In Production Phase:
• Responsible for the optimum production of pipes with required quality parameters.
• Sound operation of all the machines with minimum down time.
• To ensure that all the critical process parameters are being monitored and recorded in the shift log sheets.
• Discuss production plan with plant manager and ensure that the desired level of production is achieved in the shift.
• Adjustment of machine parameters and settings to solve any operational problem in machines and to improve the quality of product.
• Development and implementation of routine maintenance plan of all the machines
In Project Phase
• Engineering Design
o Review consultant submitted work, civil, mechanical and process control aspects of technical design, drawings (piping plans & isometrics, civil structural etc) and specification.
o Engineering estimates (civil and mechanical BOQ) and recommend adjustment as appropriate
• Erection Supervision:
o Errection of all extrusion lines as per drawings.
o Prepare scope of work, schedule, and plan and execute in order to meet an agreed program of deadline.
o To ensure all the works (civil & mechanical) at site are as per drawings and specifications
o Progress reports on fortnightly basis to keep executive project committee informed about project progress.
o Supervise and monitor the site work force and sub-contractors.
o Installation of water and pneumatic pipelines as per isometric drawings and specification
o Errection of utilities section involving chillers, compressors and cooling towers.
o Resolve any unexpected technical difficulties and other problems that arise during erection.
• Commissioning & Startup:
o Identify and remove the process deficiencies
o Commissioning of extrusion lines including test the function of electrical, pneumatic and control elements of the machines including PLC based automatic thickness and weight controller.
o Identify problems of machines and resolve them with the help of concerned department.
o Commissioning of Chillers and Compressor, hydro pressure testing of all the pipe lines.
o Upon completion of commissioning, successful startup of all the machines.
• Health & Safety
o Implementation of OHSE for the safety of workers during construction and production phase.
o Study of MSDS of all the raw materials and suggest the safety measures during production and material handling.
o Designate the place of different extinguishers and DPC trolleys.
o Arrange training of manager staff and workers about use of fire extinguishers.
Lucky Plastics Pvt Ltd,
February 2006 to May 2006
Worked as a operation Engineer at calendaring plant for the Manufacturing of PVC film and calendaring plant for the manufacturing of PP, PS and ABS sheets.
To build my future and gain experience in polymers field.
Seeking a challenging and long term career in a dynamic organization which honors
commitment and hard work.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com