Ref. No. : CA - 37403 - (Maintenance and Service - Dies & Tools – with 11.2 years in Plastic Industry)

Education

B.E Mechanical From University college of Engineering2009- 2013

12th From SKS Government higher secondary school, Year 2009.

10th From SKS Government higher secondary school, Year 2007.

Skill Sets

Man power Handling Press Tool & Mould Maintenance Spare Procurement & follow ups
Kaizen implementations Jig & Fixture Preparation & service Project&Execution

Work Experience

Senior team Member
From : Jan-2019 To Till Date
Company Profile : Manufacturer of Motorcycle, scooter and Moped tyres

Job Profile :
Adherence to schedule and maintenance budget Reduction in cost of maintenance % Reduction in accidents and unsafe conditions
No. of Improvement initiatives. o Support Production and Engineering to manage and guarantee on time availability of tools (moulds, drums, accessories, spare parts) to ensure continuous production.
Assist in planning for new tools in consultation with the Mould Planner, as required.
Provide quotations for new tooling, modifications and repairs.
Compile the quotes, create statements and communicate the necessary to the Projects team for negotiation and releasing of PO for the tools. o Follow-up with the vendors for obtaining tool (i.e., rubber, drums, accessories) sample and send to R&D for approval.
Conduct minor corrections to the procured new tools (i.e., moulds) to suit with the existing moulds in the plant and request the Quality team for inspection. o Conduct inventory of the tools as required as per the production plan and release it to the manufacturing units.
Ensure all stock items, tool inserts and spares are properly stored, preserved and organised.
Ensure zero loss or damage and optimum utilisation for all tools issued. o Ensure safety measures are necessarily followed by the team and take initiative to enhance acceptance of safety. o Report and prepare RCAs in case of accidents.
Maintain mould history cards and review records of all work carried out on each of the moulds.
Maintain and update operating & training manuals.
Monitoring customer complaints (Related to Tool& fixtures) and effective corrective actions, as not to recur the problem.
Assisting in the Trials of Press tools Fixtures Developments as per Production Requirements & sub sequence modification
Improvement projects with Quality & NPD CFT
Spare monitoring and spare follow-up with vendors (wire cutting, hardening, CNC, CG & various processes)
Fixture Spares wear out limit setting. o In house fixture and tool check sheet Preparation & Updation. o Accomplish low-cost automation projects in the plant. o Raw materials planning &arrangement of various resources (OHNS, D2, MS, HCHCR, drilling tools, grinding M/C tools, Lathe Tool Follow up with vendor and purchase)
Establishment of working system as per time savings and manpower reduction related KAIZEN (Continuous improvement) is performed to improve the productivity. o To maintain and document preparation for AVB audit observation and NC closing.
Presenting department monthly reports Such like Cost data, breakdown analysis and maintain the history card for Jig, Fixtures & tools
Fixture and tool MTTR & MTBF calculation and corrective action taken. o Monitoring Fixture calibration plan execution co- ordinate with production team. Preparing & updating the tool room documents as per IATF Standards. o Responsible for new product development activities
FUNCTIONAL ACHIEVEMENT:
3-Wheeler Auto Muffler Cat Adopter welding stage. manual to automation -Tack welding and full welding two process combine as one process. =>Cat assembly SPM rotary welding. One tack welding process eliminated. o BMW Muffler Exhaust pipe RM cost reduction by excess Cutting length Elimination. o Jupiter (N118) Muffler body Noise Issue Reduction using Through Copper shield. Customer rejection (Noise Issue) Eliminated. o Apache muffler Two Models (U86 &U180) Fixture Change over Reduction and Space reduced. In single Stage rotation arrangement given front and back. o Provided SPM Torch holding Nylon Sleeve instead of Cotton paper and emery Sheet overall plant for reducing the weld offset issue. INDUSTRIAL PROJECTS
RE-Branding Converted 400 sets of moulds from Tvs tyres to Tvs Euro grip with in a short period successfully
5S project - Won GEMBA award for best of 5s practice & Training
Guide Pin Provision- Reduction of Mould correction & tyre rejection.

Engineer
From : June-2014-Dec-2018
Company Profile : Manufacturer of Chassis Parts, HCL Products, Copper Rods And Wires

Trainee
From : May-2013 to June-2014
Company Profile : Lunar Tools

Future Goals

Intend to build a career with leading corporate of hi-tech environment with committed and dedicated people, which will help me to explore myself fully and realise my potential. Willing to work as a key player in challenging and creative environment to achieve the targets.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com