Masters in Business Administration IMERT Pune, University of Pune.
Bachelor in Industrial Engineering. PREC Loni, University of Pune
Computer other skills :
Course in Solid Modeling in PRO-E from Model Cam Technologies.
Undertook a certificate course in MS Office and Windows 95 from NIIT, Pune.
Working knowledge in Autocad 2004 Visio Standard
Introduction and implementation of flexible manufacturing assembly lines and cell concept at Philips for Audio Systems
CTV activity set up at Pimpri plant layout of stores, line layout, benchmark productivity improvement to 800 sets / shift
Implementation of LG CTV PCB activity Layout of Stores, line layout, productivity improvement to 2300 pcbs / shift,
Ergonomic workbench design for mechanical assembly
Providing manufacturing quotes for Variety of customers in field of Medical equipment, Energy meters, mobile chargers, TV, Set top box, swipe card readers.
Shifting of plant to Ranjangoan Assembly line layout as per work cell concept.
Thomson Set top box assembly project from Quote to line design, layouts to ordering equipment to achieving 100k per month as planned.
Assistant Manager - RFQ Quote Analyst and Industrial Engineering .
Dec 2002 to Till Date
Job Profile
Responsible for ( Manufacturing Engineering and Industrial Engineering ) Quotes for all new PCB-A & Box Build products of Large range of customers, Industrial engineering support to all workcells Philips, LG, GE Medical, Thomson, Echostar, Landys & Gyr
Takt time, cycle time, work distribution, MOST analysis Machinery/equipment selection, assessment and ordering support .Line designing for enclosures, ordering support, establishing line Material handling / Workstation design, ordering and modifications 5S, Value stream Mapping, OEE and OLE Layout modification and productivity improvement.
Worked on Philips CTV PCB-A and enclosure assembly. LG PCB assembly, GE healthcare and Transportation PCB assembly, Thomson- Tata Set top box assembly, Echostar ( Export) Set top box assembly, Landys & Gyr energy meter PCB-A
Officer in the Organisation and Efficiency Department
Executive in Engineering department in the PCB division
Feb1998 to Dec2002
Worked with Philips India Ltd
Job Profile
Cycle time estimation, work distribution, tooling requirements, layout, Direct labor requirement for all new Audio / CTV introductions
Productivity improvements & cost reduction projects
Member of ECN committee, providing cost implications to all the change proposals.
Providing cost estimation for plastic piece parts during development stage of the product for set price cost feasibility.
Calculation and negotiation of job work - making changes for products off loaded.
Costing price calculation for PCB chassis
Worked on different types of Audio systems, single deck, double deck, CD systems and CTV from 14 to 29.
Executive in Engineering department in the PCB division Philips contract manufacturing services
Cost Calculation for PCB assembly(PCB-A)
Preparing and issue of manufacturing sheets for PCB-A
Process engineering FMEA, tooling list, visual aids, ECN, trouble-shooting process related problems.
Worked on several PCB s for- audio and CTV for Philips, CTV for LG, Philips multi media speaker, whirlpool refrigerator Temp controller
Team Member in the Product Development department
Aug1997 to Feb1998
Worked with Kromberg And Schubert Motherson Sumi Ltd. Pune
Job Profile
Responsible for preparation / issuing of manufacturing process sheets and line balancing as per cycle time. Setting up manufacturing assembly requirements of the new product on the lines and stage wise work distribution. NPI cost & support. Worked on 46 Wiring harness for Mercedes Benz. Norms for Wire cutting and splicing machines, terminal crimping machines, Manual assembly of wiring harness & testing. Assembly norms for Mercedes Benz dashboard assembly.
Trainee Eengineer
Feb1995 To Sep1995
Worked with Garware Wall-Ropes Ltd. Pune
Job Profile
Responsible for setting up of production norms for yarn doublers/ twisting machines, rope winding machines, braided twine making machines for different sizes.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com