Diploma in Electrical Engineering passed in 1973 from Government Polytechnic Gorakphur in First Division and secured 67.5 marks in aggregate.
High School Examination Passed in 1966 from H.R. Inter College, Khalilabad Distt, Basti (U.P.) in second division and secured 59.8 marks in aggregate.
Designing Planning, Erection, Maintenance Electrical & Mechnical.
Deputy Manager Maintenance
27th Feb. 2003 to till date
Presently working with A food processing unit
Job Profile
Took charge of maintenance of Electrical and Mechanical (utilities and plant machineries).
Manager Engineering Services
01st Dec. 1995 to 27th Feb. 2003
Worked with Bhalla Chemical Works (P) Ltd. Gurgaon
Company Profile : Manufacturer of Zerconium Oxide, Zerconium Carbonate.
Job Profile
I and took charge independently of maintenance As Manager Engineering services.
Manager Engineering Services .
01th July 1994 to Nov 1995
Worked with Deepharma laboratory Ltd. Bhiwadi (Manufacturer of SMX, Ibuprine, TMP).
Job Profile
I have been giving the responsibility for designing, planning and procurement of the utilities machinery. After commissioning I had took charge of the maintenance of the plant and machinery.
Deputy Manager Engineering.
18th March 1990 to June 1994
Worked wit India Ceroils Ltd., Dharuhera; (Manufacturer of Sulphuric Acid, Single Super Phosphae & Eddible Oils).
Job Profile
Besides of Maintenance of Electrical & Mechanical I had been given charge of the project of Edible oil plant. Total Designing, Planning, erection & commissioning of electrical distribution and utilities had been carried out by me.
Maintenance Superintendent
28th March 1988 to 17th March 1990.
Worked with Paharpur Plastic, Ghaziabad (U.P.)
(Manufacturer of Plastic Woven Sacks) Worked.’
Job Profile
As maintenance Superintendent Planning , Erection, Commissioning of Plant and machinery of wind molar extruder, circular looms (4 & 6 Shuttles) had headed by me. Design, Erection & Commissioning of Electrical Distribution System and utilities had been carried out by me. After commissioning I had took charge of maintenance of Electrical & Mechanical Departments.
Electrical Engineer.
22nd Feb. 1982 to 30th April 1988
Worked with Mutittech International Ltd. Dharuhera (Manufacturer of Sulphuric Acid, Singlee Super Phosphate and Plastic Woven Sack).
Job Profile
I have joined when Commissioning of the Plant was going so I had got very good experience in commissioning of H.T. Transformer, OCB, ACB, MCC, PCC, Mottors Instrument and D.G. Set. Erection & Commissioning of the Plant and machinery of Kol-site, wind moral extruder, Circular loom of plastic woven sack had been completed under my supervision.
Senior Electrical Supervisor.
15th Nov. 1978 to 17th March 1982 worked
Worked with Haryana Detergents Ltd., Dharuhera (Manufacturer of Synthetic Detergents and Powder.
Job Profile
Planning, Erection, Commissioning of H.T. Transformers, H.T. Switch Ffuse Unit, Air Circuitt Breaker, Power Control Centre, Motor Control Centre and Cable laying, after completion of the project I took charge of the maintenance.
Maintenance- cum - Productions Supervisor
1st Jan 1977 to 14th Nov 1978.
Worked with Khanna Brother, Khallalabad (A manufacturer of Plastic/ Nylon Machnery spare parts of Textile , Chemical and Paper Mill)..
Job Profile
I had worked independently and reported to Proprietor directly. It was the Company where all the items were either moulded or fabricated . I had worked with full fledge workshop equipped with Lathe Machine, Shaper, Milling Machine, Power Hacksaw, Drilling machine etc. and had got good experience in the workshop.
Electrical Supervisor (trainee)
11th July 1975 to 31st Dec. 1976
Worked with Swadeshi Polytex Ltd. Ghaziabad (U.P.) Manufacturer of Synthetic Fiberes).
Job Profile
I learned about repairing and fault shooting in MCC, PCC, ABC, OCB & annouounciation system. I had worked with our own hands.
An Apprenticeship Trainee.
28th Dec. 1973 to 27th Dec. 974.
Worked with U.P. State Electricity Board, Test laboratory, Gorakhpur (U.P.)
Job Profile
Responsibilities was given to assist in calibration and repairing of K.W.H. and Trivector Meters .
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com