B.Tech in Electrical Engg From B.M.Institute of Tech. & Mgmt., RVD University Udaipur in 2009
Three Years Diploma in Electronics Engg. From Govt. Poly. Ghaziabad Affiliated to U.P. Tech. Board of Lucknow in April 2004.
S.S.C. From S.G.I.C Basta (Bijnour) U.P Board, Allahabad in 1998
A Professionally qualified and experienced. Maintenance specialist with extensive knowledge and skill in Electrical, Electronics, Mechanical maintenance and Repair maintenance.
Basic knowledge of Computer in Microsoft Excel, Word, Power Point, Internet & SAP
Dy. Mgr. Maintenance & Utility
Since Dec 2011
Company Profile: Manufacturer of Anti Vibration Systems viz. Engine Mountings, Primary Suspension Mountings, Power Train Mounting Systems, Exhaust Hangers, PU Parts for all leading Automotive Industry like Maruti Suzuki, Ford, Toyota, General Motors, TATA & Renault Nissan etc.
Sr. Engr. Maintenance
July 2010 to Dec 2011
Company Profile :Manufacturer of injection molding (250 T to 910 T), PU Molding & Paint Shop
Asst. Mgr. Maintenance
Dec 2006 to May 2010
Company Name : Life Long Meditech & India Ltd
Company Name : Engaged in injection molding (50T to 250T), die-casting, auto parts assembly of GE Motors, Arvin Meritor and medical devices brand name is Safeway as disposable Syringe, Needle & SV set’s etc.
Asst. Engr. (Electronics & Electrical Maintenance)
July 2004 to Dec 2006
Company Name : Hindustan Syringes & Medical Device Ltd.
Job Profile :
Manage the maintenance of plant m/cs & utility.
Maintenance of m/cs – Plastic & Rubber Moulding m/cs (make- L&T, Ferromatic, Multiples, JSW all electric, Toshiba all electric, Supper Master and Desma rubber moulding etc.), Die Casting m/c, PU Moldings, SPM, Printing m/c, Assembly m/c, Packing m/c etc.
Maintenance of m/cs – Metal Preparation m/c’s as Phosphating lines, Shot Blasting, Rotary, Roll Coater and Paint Booths etc.
Maintenance of HT 33KVA, LT Panels, ACB, VCB and Transformer Testing etc.
Maintenance of Utility System and Controlling (DG sets, Air dryers, Chillers, MTC, AC units, Air Compressors, Cooling towers etc.)
Familiar with Different type Sensors (Proximity, Read switch, Photo Electric, Fibers Optic, Thermocouple and RTD etc), Counters, Solenoid Valve, Limit Switch, PID Controller, PLC, and AC & DC drive system.
Proficient in Troubleshooting & Problem solving techniques for smooth running & to improve efficiency of plant.
Responsible for reconditioning & overhauling of plant machinery for increasing machine available time.
Responsible for improving and modifying machines as per requirement for achieving better productivity and quality.
Responsible for installation & commissioning of new machines.
Maintenance of basic system of electrical, power & distribution.
Responsible for energy saving projects & cost reduction.
Breakdown maintenance analysis and preparation of preventive schedule and checklist.
Handle manpower, material planning & indenting.
Maintain and control of spare parts inventory.
Local venders develop for substituting imported items.
Maintained MTTR, MTBF and Total down time, MIS etc.
TS documentation & calibration of instruments as per due dates.
To maintain the effective training programs so that effective workforce can be developed for the company’s future
Projects:-
Done installation and testing of 10 nos. Injection Moulding machines, make L&T Demag 150 Ton in Lifelong plant in March 10.
Done installation, and testing of 04 nos. Injection Moulding machines, make-Toshiba all electric 160 Ton in Lifelong plant in Oct.09.
Done installation, and testing of 2 no. Injection Moulding machines, make-JSW all electric 180 Ton in Lifelong plant in July 08 & Dec.09
Done installation, and testing of 06 nos Printing, 06 nos Assly Korea-make, 04 nos Pkg M/C’s make-Hersonber Taiwan and 06 Blister packing m/c in Lifelong plant in Jan.10
Done installation, and testing of 02 nos. process chiller, make-Reynolds, one Air compressor make – Kaiser and AC Hitachi Chiller in Lifelong plant in Oct.09.
Training Qualification:-
Training of L&T Moulding M/C’s in Chennai.
Training of SAP
Training of QAD.
Training of Kaizen activity.
Training of POKA-YOKE.
Training of TPM.
Training of 5’S.
Growth
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com