Diploma in Industrial Electronic From Smt. S. S. Patil Institute of Technology, in 1991
Experience in Electrical Project management, Proposal,Detail engineering, Electrical Design, Procurement, Contract management, Coordination for site activities with client, Maintenance Operations, Spares Management, Project Management, Planning & Execution.
Proficiencies in managing maintenance operations with proven abilities in reducing downtime and enhancing operational efficiencies of the same.
An enterprising leader with excellent analytical, problem solving and man management skills.
Electrical Maintenance Manager
Since Apr 2017
Company Profile: Manufacturer of polythene products to the agricultural, horticultural, food and beverage industries.
Job Profile:
Maintenance of lohia circular looms for PP/HDPE oven sacks bags, Lamination machines, tape plant, winding machines, longbow rotagravior printing, lamination machines and slitting machines, blown film plants, side sealing bag making machines, both even bag making machine, DG sets, compressors.
Maintenance of AC/DC Drives & PLC Trouble shooting.
Asst. Electrical / Electronics Engineer
Mar 2014 to Feb 2017
Job Profile :
Regular Preventive breakdown maintenance of all electrical and electronics equipment's.
Maintenance of 320 Kva x 2 DG Sets.
Maintenance of 2.5 Mega Watt x 2 steam power generation system.
Maintenance of 32 Ton capacity steam generation capacity boiler.
Regular management of shift duty .
Total handling of manpower 22 electricians.
Electrical Engineer
Oct 2013 To Jun 2014
Company Name : Deesan Agro-Tech Ltd.
Job Profile :
Executionand maintenance of 500TPD Soya bean preparation, Solvent Extraction and D.O.C. plant electrical work.
Flameproof Work for all electrical equipments at Solvent Extraction plant.
Regular maintenance of all electrical equipments In 6,8,10 tons boilers,300TPD,500TPDx2 Soyabean processing plants.80 TPD & 40 TPD refineries for soya bean oil. Maintaining of regular records for power consumption of complete plant, maintain power factor to unity. Maintenance of transformers 1500Kva,1250Kva,750Kva,300Kva.Maintenance of 380Kvax3,125Kva DG sets.Reporting to directors.
Total persons working underare 13.
Project Manager (Electrical)
Jan.2012 to Sept.2013
Company Name : Prolific Systems and Technologies Pvt.Ltd.
Manager- Electrical and Automation (Projects).
Aug 2009 to Dec.2011
Company Name : Hydroair Tectonics(PCD) Ltd.
Job Profile :
Tendering Electrical project work: Pre bid :- Taking Part in pre bid activities and meetings, Preparing estimation & costing of complete project.
Project execution:
Key Tasks & Scope of Work
Preparing bar chart, DPR for complete project up to handover of the project for all activities including design, approval, procurement, erection, commissioning, appointing contractors, preparing SLD, Cable layout, external/internal lighting layout. Preparing cable schedule,B.O.M. as perSLD, cable layout, lighting layout for the project.Preparing data sheets for the electrical material and taking approvals from the client consultants. Making technical comparisons before purchasing the material. Floating enquiries for purchase of the material and placing purchase orders for electrical instrumentation material/equipments. Identify and finalize suitable contractors for electrical work
Prepare a list of tasks of each contractor.
Monitor progress against each task.
Prepare bar charts and CPM/PERT at appropriate intervals.
Fulfill all requirements of team members working under.
Evaluate the team members working at the site.
Fulfill all requirements of the Architects/Consultants to the site.
Fulfill all requirements of the site as per concerned government authorities & client.
Co-ordinate with the suppliers in time.
Give periodic progress reports to the Accounts Department and Senior Manager.
Ensure payments to be made on time to all agencies working at the site.
Ensure correct safety and security at site.
Prepare total costing of projects.
Prepare reconciliation of the project.
Carry out the rate analysis for the items.
Verify the bills received from the sites.
Verify bills prepared by Site Engineer.
Check the material consumed w.r.t. Bills of Quantities (BOQ).
Handover of the project after completion and claim for all retention amount and closing of the project.
Saving cost at every stage resulting in profits from 35%-70% in procurement and in designing 30%.
Electrical/ Electronics Maintenance Executive.
Nov 2006 to Aug 2009
Company Name : Jain Irrigation Systems Ltd
Company Profile : Leading pipe manufacturing company
Chief Electrical and Electronics Engineer.
Jul 2004 to Jul 2006
Company Name : SPA Packaging (U) Ltd.
Job Profile :
Playing a pivotal part in managing the Maintenance of AC/DC DRIVES in extruders printing machines & electrical maintenance work and production with a team of 5 personal; reporting to M.D.
Targets achieved of Rs. 141 thousand/day; exceeded the targets by 100 %.
Successfully attained the 90% cost reductions.
Instrumental in enhancing the process by 100 % and thus attained 5% reduction in defects and rejections.
Efficiently achieved 50% escalation in productivity.
Initiatives taken to improve layout across the plant like modified complete wiring system to increase productivity and quality of bag making machines.
Projects undertaken across the tenure with the organisation like conversion of old Korean Tayo and made side seal machines to servo driven high quality and high speed bag making machines total 14 machines were modified.
Bagged an Appreciation Letter for the hard work performed.
Electrical Maintenance/Development Engineer
Jun 2000 to Jun 2004
Company Name : Action Engineers
Job Profile :
Efficiently managed maintenance of Oil Testing Kits from 40 KW to 100 KW; handled repairs of any instrument; calibration of Pressure gauges, steel tapes & scales; reported to Proprietor
Targets achieved of Rs.30 thousand and exceeded the targets by 10%.
Successfully handled the maintenance, calibration and development activities.
Projects undertaken across the tenure with the organisation like development of precision frequency generator for calibration purpose, inverter (low current high voltage up to 100kv).
Electrical & Electronics Engineer
Nov 1995 to Jun 2000
Company Name : G.E. Lighting (I) Ltd.,
Job Profile :
Instrumental in conducting activities in regards to the maintenance of A.C. / D.C. Drive, Temp. Controllers, Vacuum Gauge GE-Fanuc make PLC’s for all automatic machineries & Electrical Maintenance; reported to Chief Engineer (Electronics Department).
A target achieved of Rs.200 crore’s& exceeded the targets by 20%.
Attained 100% cost reductions.
Instrumental in improving processes like removed all old limit switches and modified; attained reduction in defects and rejections by 95%.
Projects undertaken across the tenure with the organisation like modified old hungarian sealing /packing machine for tube lights with packing capacity of 1500 tube lights/hour.
Electrical & Electronics Engineer
Jul 1994 to Nov 1995
Company Name : Choksi Tubes Co. Ltd.
Job Profile :
Handled electrical maintenance of MannesmanDemag make hydrolic press
Including PLC,CNC lathe machines,Pilgermill,drawbench,deep hole drilling machine,(billet preparation section) for SS304L seamless metal extrusion pipes.
Familiar with alluminium extrusion machine at bancoalluminiumbaroda.
Electrical and Electronics Engineer
Jun 1993 to Jun 1994
Company Name : J.P. Industries
Jr. Electrical and Electronics Engineer
Aug 1991 to Jun 1993
Company Name : Continental Papers Ltd.
Maintenance Purview
PLC Controlled Systems (Messung Systems: Meprolog–H, XMP8-40 Siemens (German) a 110 U & b 135 U)
CNC Lathe Machines, Deep Hole Drilling Machines, Pilger Mill, Draw bench, Hydro testing & Mannesman Demag make 1250 tonnes Hydraulic Press for manufacturing of Low Carbon Seamless still pipes Maintenance of D.C. Drives, & Inverters. Electrical Devices.
Plastic Processing Machineries {Blow Film, PVC Pipe, Tape, Lamination Plants with oven sacks (PID Controlled) Box strapping Tape Plant etc.; D.C. Drives System From 37 KW to 131 KW D.C. Motors.
Areas Of Expertise
Maintenance Operations
Developing and implementing plans & schedules for Maintenance Operations and Annual Turn Arounds with focus on optimum utilization of manpower and material.
Managing the functions of troubleshooting and preventive/ breakdown maintenance of Machines, Gauges, PLC/ CNC Systems; AC/DC Drive Systems so as to reduce downtime to minimum.
Undertaking regular inspections to prevent accidents and adhere to safety norms.
Spares Management
Assessing requirement of spares; indenting material; interfacing with Purchase Dept for on time procurement of technically approved indented material.
Governing the inventory function of spares involving planning for storage and use of material so as to improve storage conditions and reduce expenses & wastage to minimum.
Project Planning
Preparing bar chart, DPR for project execution,Designing of electrical single line diagrams for L.T. & H.T. Panels, Designing cable layout, lighting layout (internal/external) for the project. Procurement of electrical and instruments as per approved B.O.M. & B.O.Q. identifying and finalizing suitable electrical contractors for execution of the job as per planning.
Evaluating feasibility for the execution of plant modification projects for Instrumentation; developing plans & schedules for the same in sync with project budgets.
Estimating need for material, parts & components; generating Bill of Quantities for timely supply.
Project Execution
Directing site execution activities involving erection & commissioning of machines, electrical systems etc.
Monitoring activities of personnel towards ensuring adherence to safety norms.
Deploying review systems to manage execution of projects on time and as per budgeted parameters
Middle level positions in Maintenance Operations, Project Management with leading organisations
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com