Diploma in Electrical in 1995 from Bombay Board with 66%.
COMPUTER:
Operational knowledge of MS Office, MS Projects, AutoCAD etc.
QUALITY SYSTEMS:
Well conversant with: ISO 9001 : 2000 systems, TS 16949.
5S, TPM.
Assistant Manager - Electrical Maintenance.
Dec 2005 Onwards
Presently working with a leading company in western India
Job Responsibility:
Maintenance of-
22 KV substation with installed capacity of 1.6 MVA.
L&T make ACB`s up to 3200A.
650 KVA & 75 KVA DG sets with AMF and AVR Controller.
PCC`s, MCC`s and DB`s.
DC Drives Eurotherm & Siemens makes up to 710 Amp.
AC drives of various makes such as Eurotherm, Siemens, Control Technic & Bonfiglioli.
Indigenous PLC Controlled Tube Mills, Draw Benches & Straightning etc. machines.
Allen Bradly SLC/ Micrologix, Siemens S7 200/300 S5 100U/ 135U make PLC`s.
Cranes 25T, 5T, 3.2T, 2+2T, 3.2+3.2T of Demag & WMI makes.
3TR/HR & 2TR/HR annealing furnaces.
Elgi make (28 Nos.) air compressors.
Electrical Engineer
May 2000 to Dec 2005
Worked with Associated Capsules Pvt. Ltd., Shirwal.
Job Responsibility:
Maintenance of-
33 KV substation with installed capacity of 1.6 MVA.
Siemens and L&T make ACB`s up to 2500A.
1250 KVA DG sets with AMF and AVR Controller.
PCC`s, MCC`s and DB`s.
Atlas Copco make (3 x 254 cfm) air compressors with Air Drier
Blue Star make chilling plant with capacity of 300 TR/HR
AC drives of various makes such as ABB, Mitsubishi, Hitachi, Fuji and Allen Bradly up to 436 H.P.
Indigenous PLC Controlled Capsule Manufacturing, Printing and other auxiliary machines.
Mitsubishi make PLC`s - MELSEC-A series.
Prime movers up to 325KW.
DM, Ultra Filtration, Water Treatment Plants and related accessories.
Cooling towers and Vacuum pumps.
Plant capacity Up-gradation Project job responsibilities:
Installtion & Commissioning done of-
33 KV line with installed capacity of 1.6 MVA.
33 KV ABB make SF6 Breaker Panel for (2 X 1.6MVA) Transformers.
1250 KVA DG Set with AMF & AVR Controller.
Blue Star make chilling plant with capacity of 422 TR/HR.
Maintenance Engineer
Dec 95 to Feb 2000
Worked with Bajaj Dhatu Udyog, Nagpur.
This project was promoted by M/s BAJAJ PLASTICS LTD., Nagpur as an independent
division with an objective of making SG Iron castings for Automotive industries. This State
of the Art foundry was commissioned in February 1996.
Job Responsibility:
Maintenance of -
132 KV/11KV substation with installed capacity of 16/20 MVA
SF6 Circuit Breakers & associated accessories.
LT Substation with installed capacity of 4 MVA.
PCC`s, MCC`s & DB`s with PLC control.
850 KVA DG set JACKSON make with AMF and AVR Controller.
Elgi make (2 x 750 cfm) PLC controlled air compressors with Air Drier
15/5 tons EOT crane with weighing scale & remote control
10 tons EOT crane with facility of Lifting Electromagnet.
Erection, Commissioning & Maintenance of Prime Movers up to 135 KW.
Erection, Commissioning & Maintenance of Variable Frequency
Drives, Siemens make with its control from PLC`s.
Erection, Commissioning and Maintenance of PLC Controlled foundry
related equipment. (Furnace, Autopour, Molding M/c & Sand Plant etc.)
Working knowledge of Computerized Maintenance Management System.
Working knowledge of S5software used for Siemens PLC`s.
Working knowledge of MS Office and AUTOCAD.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com