PD-PMD Post Diploma in Plastics and mold Design from CIPET Central Institute of Plastics Engineering and Technology from Bhopal (M.P) Duration One Year.(1999-2000)
Other Qualification: Auto Cad from CIPET Bhopal.
Extra Activities:
Training in Thailand
Injection process Survey
Study about injection machine& its Basic control
Study about crane control operation and its safety.
Initial Start-up of machine and its auxiliaries.
Details about mold loading & unloading procedure.
Machine starter after mold change.
Detail about machine condition & adjustment.
Study about hot runner & valve control system.
Study about different models of mold.
Study about different inserts – Model wise & How to change
Schedule of preventive maintenance of mold & machine.
Step & procedure followed by preventive maintenance of mold
& machine.
Manager (Tool Room Mould Maintenance,
From April 2021 to till date
Company profile- furniture manufacturing
Job profile-
Preparation of Annual Budget Plan for Mould spare parts.
Responsible for maintained critical spare parts availability in stocks to reduce major breakdown (Like core & cavity inserts)
To make 5 WHY sheet of each breakdown related to mould & deeply analyze the root cause.
Preparation of all Mould history card to take action against frequent breakdowns Awareness & implementation of 5S & Kaizen
Approval & Trial of new injection moulds & make mould data sheets.
Responsible for resolving all technical problems with the co-operation of the project and design teams.
Preparation of preventive maintenance schedules for Moulds.
Do necessary major rectification like flash in Article, mold alignment, uniform wall thickness of article or mold flow analysis
Do necessary modification to improve cycle time in order to increase productivity.
Scheduling of preventive Maintenance of Mold and Tool room M/c.
Attending breakdown and do necessary repair in Mold ie. Polishing, HRS heater replacement and Hydraulic cylinder repair and spotting of mold
Short Knowledge of Injection Mounding M/c
Responsible for maximizing the performance and profitability against the already agreed targets and control.
Supervise, plan, evaluate and organize the tool room
Lead the team members in positive ways and train them to achieve the high productivity in the most safe and efficient manner.
To provide time to time training to the employees of tool room for Mould Maintenance & new techniques
Responsible for engineering change notice implementation in Moulds
Responsible for planning & conducting internal & external audits on matters related to the quality system
Manager (Tool Room Mould Maintenance
From May 2019 to April 2021
Company profile- manufacturer of suspension part of rubber & plastics & sheet metal parts for Indian Railways & metro Railways
Previous Organization: PHOENIX UDHYOG PVT.LTD.
NEEDLE EYE PLASTIC PVT. LTD
(RBS GROUPS OF COMPANIES)
Designation: Deputy Manager (Tool Room Mould Maintenance)
Duration: 2014 to 2018 July
Previous Organization: KEIHIN PANALFA LTD.
Designation: Asst Manager (Tool Room Mould Maintenance)
Duration: July, 2006-2014
Previous Organization: M/S NILKAMAL PLASTICS LTD.
Designation: Sr. Engg. (Tool Room Mould Maintenance)
Duration: 2001-June 2006
Previous Organization: Dheeman Engineering corp. Faridabad
Designation (2000to2001) Engg. (Tool Room Mould Maintenance)
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com