Ref. No. : CA - 10780 - (Production - Extrusion - Woven Sack – with 19.5 years in Plastic Industry)

Education

B.Tech. in Mechanical Engineering, from IEC College of Engineering & Technology, Greater Noida, UP Technical University with 67%. (2002-2005).
Diploma in Mechanical Engineering, DayalBagh Educational Institute, Agra, India with 70.70%. (1999-2002).

Skill Sets

Expertise in entire factory operation and planning of raw materials and machine.
Experience in preparing various report like MIS, DPR, KPI, DN time & B.DN report.
Experience to develop production Plan & schedule.
Experience in Budgeting, Estimating and Costing.
Experience in preparation of Method statement, Specification Comparison sheet, Transmittal, comply statement, quantity take off BOQ/BOM.
Experience in preventive and periodic maintenance.
Experience in preparing Production order, control plan, process sheet & work load sequence.
Experience in allocation and de-allocation of production resources.
Strong communication & team building skills with proficiency at grasping new
functional concepts quickly & utilize the same in a productive manner.

Work Experience

Works Manager (Factory Head)
Since June 2009
Company Profile: Manufacturing PP Woven Sacks Fabric
Job Profile:
Overall responsible for managing the entire Factory operation & Planning.
Fixing achievable target of quantity of production, quality, manpower requirements, production loss, calcium carbonate dosing, tape to be produced, allocation per shift and monitor on daily basis achievement and failure.
Designate responsible person at different level of production/shift/focus on their activities, support them, correct them, monitor them and incentive them.
Mechanical and Electrical maintenance services-organize at optimum level.
Plan for Tape Plan/Looms/Lamination/Recycling/Manpower and production desired and weekly performance.
Implementation of corrective and preventive action based on monitoring efficiency.
Co-coordination with stores, marketing, sales department on inventory, dispatch and production plans.
Authority to approve resources like manpower, Equipment and purchase order.
Preparation of Costing: Manufacturing Cost and Budgeting.
Reduction in cost, wastage & Optimization of Raw material mixing.
Preparation of MIS report and reporting to Director.

Achievement:
Increased production volume by 20%, Reduce Machinery break down up to 1% of total working days, Increase calcium carbonate dosing up to 26% of total production.

Production Manager
Mar. 2008 – Jun. 2009
Company Profile: Manufacturing Automobile
Job Profile:
Develop the production plan & schedule.
Monitor & drive production progress & schedule.
Conduct production kick off & status meeting.
Allocate & schedule production resources.
Manage change requests.
Review & validate requirements.
Co-ordinate with all departments.
Preparation of DPR report and send to Director.

Achievement:
Increased production volume by 25% on 2008 as compared with 2007, Customer satisfaction lowered from 30 to 10%, Establish a department
system process, Improve Production cost Quality & delivery timing.

PPC Engineer
Feb. 2007 – Mar. 2008
GSC Toughened Glass Pvt Limited
Company Profile: Manufacturing Fabrication & Machining Component
Job Profile:
Production Planning, Material Planning, Component Planning & Costing.
Work load sequence chart Preparation/Work loading.
Project Planning & Control.
Assembly Planning.
Tracking daily for MIS CUM Utilization Report.
Comply statement / Quotation/Enquiry.
Quantity Take off BOQ/BOM.
Change priority of loading due to urgent dispatch.

Achievement:
Successfully completed BPTP Cyber Park Gurgaon India Project.
Working in a team for system process, Quality system for ERP Implementation.

PPC Engineer
Jul. 2005 – Jan. 2007
Star Alu Build Pvt Ltd.
Company Profile: Manufacturing Fabrication
Job Profile:
Scheduling of Production Project Activities & Budgeting of proposed work Plan.
Quality control and implementation support and co-ordination.
Field Follow-up report compilation and analysis for planning and implementation.
To prepare Production order, control plan, process sheet & work load.
Quantity Take off BOQ/BOM & Change priority of loading due to urgent dispatch.

Training
Successfully completed 6 months of Training on AUTO CAD.
Project Training on HVAC in Indian Habitat Center, New Delhi.

Future Goals

To fin a position where i can use my strength and knowledge

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com