Skill Sets

Planning the work & manpower as per the scheduled & carried out it within a time.
Prepare for spares PR (Purchase requisition) and get it approved from reporting officer. Regular checking of inventory in stores, carry stores reconciliation.
Preparation of failure analysis report & future action plan.
Equipment Life enhancement by value addition.
Manage the daily maintenance operations that include budgeting & optimization of manpower utilization & work scheduling.
Developing the weaker area to minimize the maintenance & cost.
Work & Manpower planning in boiler shutdown.

Work Experience

Asst. Manager (Maintenance)
Since August 2010
Company Profile: Manufacturing steel, pipes & tubes and aluminium foils with a combined capacity of 1000000 tons of iron and steel products
Job Profile:
Erection & commissioning the 2x70TPH AFBC Boiler
Erection & Commissioning the 2x10TPH WHRB Boiler
Handle the Maintenance activity of all over the plant
Maintenance of Air cooled Condenser.
Maintenance of China Base turbine & It’s Auxiliaries
Maintenance of boiler auxiliaries, FD Fan, ID Fan, Drag chain Feeder, Mechanical Spreader, Rotary feeder, IBR Valves, Etc.
Maintenance of ESP (Elex Make)
Maintenance Ash Handling System & Its Development.
Maintenance of Elgi compressors.
Maintenance of Water Treatment Plant.
Involvement of CHP Maintenance.
Scheduling of Preventive Maintenance.
Additional Responsibility of Brick Plant Maintenance.
Maintaining documentation related to Integrated Management System which includes ISO 9001:2008, ISO 14000 & 18000.

Site Incharge
Dec 2008 to July 2010
Company Profile: Leading manufacturer and supplier of Material Handling Equipment like Ratchets Buckles, Mechanical Slings, Anti Cutting Sleeve etc
Job Profile:
Fabrication & erection of 2x70 TPH AFBC Boiler (Thermax)
Fabrication & erection of 2x 10TPH WHRB Boiler (Thermax)

Production, Planning & Product Development Executive
March 2006 to Nov 2008
Company Name: Navneet Publications (I) Ltd.
Job Profile:
Production Planning & Product Development
Develop various Packaging Style for the stationary & Non Stationary Products.
Co-ordination with all departments in Head office related to product development.
Develop the new products as per market requirement
Cost estimation on new products
Actual costing calculation after completion of every product.
Controlled of wastage.

Incharge of Coating Section (Anti reflection & hard coating on Spectacles)
Nov 2002 to Feb 2006
Company Name: Prime Lenses Pvt. Ltd.
Job Profile:
Handle all over coating Plant.
Solve the Problem occur in coating Plant.
Maintain the continue production in a plant.
Weekly maintenance of a plant.
Maintain the quality of coating.
Additional responsibility of Purchase Engineer for Six Months
Complete setup of coating plant to our new branches, Noida, Kolkata, Chennai and Ahmadabad.
Trained new employee for new branches to carry out production independently.

Shift Engineer (Production & Maintenance)
May 2002 to Nov 2002
Company Name: AVIS Coating
Job Profile:
Production of Anti reflection coating on Spectacle glasses & CR 39 glasses.
Maintenance of Korean based High Vacuum Multi coat Machine.

Trainee Engineer (Mechanical)
Company Name: OTIS Elevator co. (I) Ltd.
Job Profile:
Production supervisor in a chain assembly of BTR & VTR machine.
Working as a quality inspector (Quality of material)
Calibration of IMTE’S (Inspection Measuring And Test equipments)
Maintaining the documents of ISO and follow the ISO procedure in a shop floor.

Achievements:
Getting Best performance award for the year 2010-2011
Reducing the welding work & Material by applying HDPE pipe & C-PVC pipe insist of SS pipe in WTP area.
Reducing seal consumption in Ash handling plant.

Navneet Publications (I) Ltd.
Controlled the wastage from 21% to 10%
Improved the product packing system for export division.
Develop the various packaging for upcoming products.
Minimize the process time by production planning.

Prime Lenses Pvt. Ltd.
Develop three vendors for company.
Design & Complete made portable size hard coat machine.

AVIS Coating.
Achieve the quality of production without maintenance up to 60days.

Computer Knowledge:
M.S. Office & Coral Draw 11


Future Goals

To become a successful professionally, work in competitive environment and accept time bound challenging jobs & demand the same in return

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com