Ref. No. : CA - 12241 - (Designer & Product Developer – with 33.4 years in Plastic Industry)

Education

Diploma in Mechanical Engineering from Technical Examination Board Gandhinagar
Specialization in Machine Tool Technology, and Quantitative Techniques with First class (61%) in academic year 1990 – 1991

Skill Sets

Computer skills: Internet surfing, Microsoft word, Excel and Auto CAD
Design and Development Plastic Die, sheet die, blown film die, Box Stripping die
Handle CNC tool room , production departments , assembly shop, Fabrication shop,
New project handle

Work Experience

Deputy Manager - New Product Development
Since Sept. 2013
Company Profile: One of the largest Asian manufacturers of material handling equipment, industrial gear systems and mining equipment.
Job Profile:
Headed 6-8 month cross functional development of Projects, Involving Design, Material procurements, Budget and Manufacturability of new Products. I had developed conical gear box (CON – 63) first time in history
In Manufacturing, Assembly and Testing Departments supervises 15 direct and 40 indirect contractors to focus on customer satisfaction and business growth (Planetary & Vertical Rolling Mill Gear Box)
Ensure quality of product as well as on time and within – budget completion.
Cultivate Customer Relationships.

Senior Manager Tool Room (CNC) & Vendor Development
November 2003 to August 2012
Manager Production: July 2000 to November 2003
Company Profile: Manufacturing plastic processing machines, like that Blown films, Sheet lines, Thermoforming (PP), Thermoforming (XPS)
2.1 CNC Tool Room
Installation and Commissioning, Establishment of new CNC Tool Room. Right up to purchase of new machineries, Tooling’s, utility equipments and also new recruitments, total projects established.
Sound knowledge of Tool Room procedures, operation and various manufacturing aspects.
Analyzed tooling machines and indentified issues and recommended methods for correcting it, and prevented downtime.
Constantly upgrading and improving production techniques, developing various tools, jig & fixtures to speed-up production and accuracies of various components.
Managed installation and maintenance work of all plant machinery and equipments.
Conducted employee performance evaluations.

2.2 Vendor development:
Shall look total procurement of sub contracted components required by the company.
Hand on experience in working with vendor to diagnose and resolve production problems.
Shall be guided to vendor and job works as to the nature, types and accuracies are required for the sub contracted components.
Calculation of engineering cost of any components and sub assembly, Negotiations with vendor and commercial aspects of purchase and job works activities.
To be developed alternate vendor for critical components.
Coordinated with Design, Service, Productions, Quality control, Stores, Maintenances, Accounts teams and resolved all Technical & commercial issues.
Evaluation and appraisal of sub – contractors and job workers on periodical basis.
Working in I BAAN, E.R.P. soft wear models.

2.3 Production:
Man power planning, machines planning, and monitor & guided to employees to realize monthly, quarterly and annual production target.
Controlling and monitored Tool Room, Fabrication shop, Assembly shop and Paint shop, in order to realize targeted production schedule.
Elevate organization productivity and efficiency through expert process, quality and project management’s practices.
Provided technical support to assemblies and resolved issues.
Result driven technical leader with a proven track record of enhancing the performance and profitability of diverse manufacturing process.
Leading and motivating the team of workers, supervisor and for maintaining harmonious relations with workers.

Assistant Manager (Projects)
Four years
Banco Products (India) Limited
Manufacturing of continuous P.U. FOAM MACHINE, Block Cutter, Mattress Insertion, and Power Press, for foam industries.
Job Profile:
Design and development of new trailer made machines.
Costing and estimations of above mentioned machine.
Planning and scheduling and vendor developments and material procurement pertaining to stores requirements.
Preparing drawings and sketches of various machine components on auto CAD
In-house fabrication and assembly work and finally trail and testing with desired results, Dish assembling of different machine components.
Packing of machine in various containers and dispatching them as per the schedule.
Stayed for the duration of 45 days at KAZAKSTAN (RUSSIA) for the erection and installation of the machinery.

Machine Shop Head
Three years
Rajoo Engineers Limited
Job Profile:
Installation and commissioning, Establishment of new machine shop.
Preparing machine lay out installation of new machine of different varieties.
Cultivated machine shop, production, planning & scheduling, carrying out various machine operations as per the machine–loading charts.
Assembly of plastic processing dies, & making suggestions in the design for the problems occurred during assembly.
Developed of special purpose new honing machine for barrel bore.
Men power planning of works distribution of particular machines.
Knowledge of deep whole boring machine. And thread milling machine, for barrel drilling & screw cutting.

Junior Engineer Maintenance Department
Two years
Gujarat Glass (India) Limited
Manufacturing of all types of Bottle like Soda lime & BRS.
Job Profile:
Hands on experience in working compressor; D.G. sets Water soft plant maintenance,
Monitored above accessory and ensured optimal utilization of resources and equipments.
We had a vertical, horizontal type’s compressors, D.G. sets, centrifugal pumps, 30 to 40 HP DC motors and also handled utility department.

Future Goals

Long term work in plastic machine manufacturing company.
To learn, gain and return it back to the organization

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com