Diploma in Plastic Mould Making Technician From Central Institute of Plastics Engineering and Technology in 2002
NTC (FITTER) From CSI Industrial Training Institute, Karur, 1998.
SSC From KK Hr Sec School, Velur, Namakkal Dist, 1996.
Well knowledge of dismantling and assembly of moulds.
Trouble shootings and problem solving of moulds
Asst–Manager (Tool Room)
Since May 2011
Company Profile: Manufacturing of Furniture, Crates and Roto products
Senior Engineer-Tool Room
Aug 2008 to May 2011
Company Profile: Manufacturing of LCD TV Cabinets, CTV Cabinets, Monitor Cabinets for Samsung Electronics And Automotive customer Hanil and Doowon automotive system.
Maintenance Assistant (Mould)
June 2006 to Jan 2008
Company Name: Watertec Systems India Pvt Limited
Company Profile: Manufactures of Polymer Taps, Valves, Faucets and Bathroom Accessories
Job Profile:
Break down maintenance, Preventive maintenance, Mould Correction and modification and vendor tool follow up
Tool Maker
June 2004 to May 2006
Company Name: English Tools & Casting Pvt. Ltd, (Coimbatore)
Company Profile: ETC engaged in design and manufacturing of PDC Dies, Injection moulds and also we have in house production Facilities for Aluminum pressure die castings and plastics parts And our customer of Hyundai Motors, Ashok Leyland,
Hindustan Motors, TVS, L&T, Denso, Ford, Fiat India
Proprietor
September 2002 to June 2004
Company Name: Dhivyam Industries (Paramathi – Velur)
Company Profile: Manufacturing Plates, Trays, Bowls, etc. from Arecanut Tree Sheaths
Mould Handling:
Mould handling of 25 tonnage to 2500 Ton.
Hot runner moulds, Hot runner valve gates with timer sequence moulds, Unscrew mechanism moulds, Angular lifter core moulds, Gas injection moulds and Steam injection moulds.
Duties And Responsibilities:
Taking care of mould maintenance dept and following
Prepare the mould as per production plan
Prepare the preventive maintenance schedule for moulds and maintain the same.
Preparing mould history cards
MTTR / MTBF Trend,
Mould Down Time Analysis
Predictive Maintenance
Corrective action taken for customer complaint in moulds.
Update the list of moulds and maintain it.
Planning of working methods.
Daily work allotment of employees.
Follow up of spares for moulds.
Prepare the spare parts list and maintain it.
Co-ordinating with team for implementation of 5S in all areas.
New mould trial and follow up.
Vendor tool follow.
Preparation of ISO documents and follow the procedures.
Design Knowledge:
Plastics Mould Design with Auto Cad in Central Institute of Plastics Engineering and Technology (CIPET), Chennai.
Unigraphics-NX4 (UG CAD) in UMS Technology Training Center, Coimbatore
To grow along with the organization and become as professional and excellent repute by effectively contributing towards the goals of the organization
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com