B.E.(Production Industrial Engg) in Jan 1991 from Karanataka University securing 63
Computer Knowledge
Working Knowledge of ERP software BAAN(Manufacturing Distribution )
Goal oriented individual with good leadership capabilities.
Highly motivated, and detail-directed problem solver.
Strong interpersonal skills & an ability to get along well with others
Excellent Team Player, Quick learner
Assistant Manager Manufacturing
Aug 1995 to till date
Job Profile : Production Planning of single stage & multistage pumps required for
Refineries, Chemical Industries ,Power Plants (Boiler Feed Pumps)
Issuing procurement Indents to materials department
Helping materials dept in inventory control
Issuing route cards to machine shop & assembly department
Subcontracting of components required for pumps
Coordination between Design, Materials, Project Management, Machine shop & Assembly Department etc
Checking & finalizing painting specifications in line with customer requirement
Finalizing packing box specifications
Handling Painting & Packing Of Pumps
Planning Engineer”
July 1993 to Aug 1995
Worked with Gleitlager India Ltd
Job Profile
Production Planning of Bimetal Bearings & Bushes required for Diesel engines, Compressors, Pumps ,Turbines etc
Cost estimation of Bimetal Bearings & Bushes.
Checking & approving drawings before releasing for production.
Assisting Quality control department by carrying out Ultrasonic Testing & Dye Penetrant Testing.
Junior Engineer Purchase
June 1992 to June 1993
Worked with Gestetner India Ltd
Job Profile
Purchasing of various components (turned components, press components, Plastic items, rubber items) required for duplicating machine & copier machine
Trainee
Engineer Vendor development
January 1992 to June 1992
Worked with Ravlon Pen Co Ltd
Job Profile
Follow up work of various components required for special purpose machine to produce ball point tips, Design of jigs & fixtures
Trainee Engineer”
April 1991 to December 1991
Worked “ Bullows Paint Equipments Pvt Ltd
Job Profile
Supervision of fabrication of spray booth ovens, Industrial-washing machines
For six months
Development of Paint circulation systems, Pumps for paint systems for 3 months
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com