Three Year Diploma Course In Plastics Technology From I.E.R.T Prayag Allahabad (U.P.) In 2004 With 72%
Intermediate In 2001 With 62% (U.P. Board)
High School In 1999 With 51% (U.P. Board)
Production Planning, Shop Floor Activity & Man Power Planning
Production Manager.
Since Sept 2010
Company Profile: Manufacturing and supplying plastic packaging components like bottles, caps, wrappers, seals.
Job Profile:
Blow molding ie TECHNE, Blow star, Jomar Multilayers and Monolayers, Arburg and Electronica.
It has major customers ie Bayer Crop Science, BASF, Rallis, Chambal Fertilizers etc.
Senior Engineer
From June 2008 to August 2010
Company Profile: Facilities in Blow Molding & Injection Molding. Machines in Blow molding ie TECHNE, SPEEDEX 90, Multilayers and Monolayers, L& T, Haitian and Taiplastics. It has major customers ie Hindustan Unilevers, Marico, TVS-Electronics, Rackitt Benckiser, Whirlpool India Ltd etc .
JOB PROFILE;
Loading and unloading of mold, process setting to be produce the better quality of component.
Plan for Preventive maintenance and also handling of breakdown maintenance of Mold & Machines and their accessories ie Chillers, Compressors, Hopper Loaders, Dryers also.
Man Power planning & Handling so that plant run in limited manpower’s.
House keeping with 5 S maintenance.
Documentation of ISO-9002, Six Sigma, Lean also.
MACHINE HANDLING ;
I have exposure of speedex- 90 (Kyung Won D-90 single as well as multilayer Korean Machine) its maximum capacity is 5 Ltr. Up to four Blow Molding.
I have also exposure of C.M.P. (Indian Machine) is capacity is 5 Ltr. TI PLASTIC 150 Tons , HATIAN 250 Tons, L/T 250 Tons. INJECTION MOLDING M/C UP TO SIXTEEN Injection Molding.
I have also exposure of TECHNE ITALION M/c
MATERIAL HANDLING; ABS, PC, HIPS, HDPE, LDPE, NYLON, PP, SAN etc.
Production Engineer
From September 2004 to May 2008
Company Profile: Manufacturer of blow molded caps and bottles. It has a major customers Hindustan Unilever, Oriflamme, Nivea, Merico, Fa. etc.
Job Profile:
To set the mould & machine according to quality requirements
Preventive and breakdown maintenance of Mold & Machines
To shootout the routine problems.
Man Power planning & Handling.
House keeping & shop floor.
To care the chiller, compressor etc.
To control and minimize the loss of the material.
Achievement;
Minimize the mold loading time in Blow Molding ie 15 – 12 Hrs and in Injection Molding 3 – 1.5 Hrs.
To be work as a Production Manager
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com