Post Graduate Diploma in Plastic Processing - CIPET, Ahmedabad, 1989
B.Sc. (Physics) - Dr. B.A.M University Aurangabad, 1985
H.S.C - 1982
Production & Quality.
Plant Head
Since April 2014
Company Profile: Company is engaged in Production Facility injection moulded parts for Automotive industry. Responsible for Moulding of automotive parts for two wheeler items like lighting, switch assemblies & mirror assemblies, Handling 27 injection moulding mcs.ranging from 50 ton to 350 tons. Having turnover of Rs. 25 cr p.a. This manufacturing runs with TPM activities.
Job Profile:
Works Manager
Oct 2012- Feb 2013
Company Profile: Company is engaged in Production Facility Injection Moulded parts. Responsible for moulding of plastic items for LG, HAIER, TATA BATTERIES.
Job Profile:
Planned and controlled production process and directed efforts of work force to maximize productivity and controlled cost.
Responsible for profit and loss of the unit . Undertook profit centre concept in the unit.
Involved in Proper utilization of Equipment & Manpower with minimum resources & minimum cost
Production Manager
Jan 2011 - July 2012
Company Name: AAL MIR Plastic Industries
Company Profile: Company is engaged in Production Facility injection moulded parts. Responsible for Moulding of FOOD packaging plastic, household & engineering items, Handling 11 injection moulding mcs.ranging from 60t to 580 tons. Established new set up of injection moulding plant.
Job Profile:
Works Manager
Aug 2010 - Dec 10
Company Name: Overseas Plastic Moulders India Ltd
Company Profile: Company is engaged in Production Facility injection moulded parts. Responsible for Moulding of Engineering plastic, Automotive items, Ultrasonic Welding, Assemblies for TATA. Having turn over Rs. 24 Crore p.a
Job Profile:
Planned and controlled production process and directed efforts of workforce to maximize productivity and control cost.
Responsible for Profit & Loss of the unit. Undertook Profit Center Concept in the unit.
Formulated Business Plans for improving production and achieving profitability
Providing motivational leadership to the employees and upgraded them by providing training
Enhancing customer service satisfaction through supply chain management initiative, inventory control, and flexible manufacturing practices.
Production Manager
Sep 2005 - Aug 10
Company Name: Videocon Ind. Ltd
Company Profile:
Job Profile:
Spearheading Production and Quality initiatives in the plant for plastic parts.
Entrusted with the onus of complete development & process design for the component. Significantly achieving Production Target. Submitting production report to G.M.-Operations Daily.
Drove the initiative for conceptual product design and solid modeling, supervised continuous improvement of projects. Maintaining Schedules at Optimum Levels for Achieving Production Target. Liasie with internal Customer about New Product Development and mould trials.
Provided motivational leadership to a team of Production Supervisor, Planning Officer, Store Keeper, Dispatch Clerk, Machine Operators and Assistants.
Contribute technical inputs in enhancing quality control mechanism to meet international quality standards.
Developed various test programmes for equipment, assuring attainment of product.
Reduced overall testing time by creating and documenting program to calculate test results
Manage a team and mentor them adeptly towards optimum productivity
Formed a major link between design, production and the quality department
Taking necessary decision for correcting Process, Mould and Machine. Leader of Wastage Reduction.
Accountable for stabilizing the processes and also involved in process development with the core team.
Actively involved in manufacturing of mould and responsible for the improvement of staging method in sintering process by understanding the material property & its behavior.
Involved in Proper utilization of Equipment & Manpower with minimum resources & minimum cost.
Coordination with Maintenance, Tool Room, QA, Assembly & PPC to Get High Productivity
Worked in ITALY on deputation to stabilize process. Trained local work force on injection moulding process.
Visited China to get training of Haitian machines and for inspection of machines before dispatch.
Deftly employed latest technology viz. gas assisted moulding technology in production and achieved low cost productivity. Streamlined new project of Pressurised Hot & Cold moulding technology.
Deftly resolve Customer Complain regarding supply of cabinets. Handle 1600t to 530t machines.
Streamlined shop, In House Environment, Machine and Safety processes
Plant In charge
Jun 2004 - Sep 2005
Company Name: Attitude Plastics
Company Profile: Company is engaged in Production Facility injection moulded parts. Responsible for Moulding of Engineering plastic, House Hold items, screen printing, Ultrasonic Welding for Battery Industries. Having turn over Rs. 15 Crore p.a
Job Profile:
Planned and controlled production process and directed efforts of workforce to maximize productivity and control cost.
Responsible for Profit & Loss of the unit. Undertook Profit Center Concept in the unit.
Formulated Business Plans for improving production and achieving profitability
Provided motivational leadership to the employees and upgraded them by providing training
Enhanced customer service satisfaction through supply chain management initiative, inventory control, and flexible manufacturing practices.
Increased operating performance by reducing labour costs. Ensured raw material & F.G. reconciliation.
Exceeded production schedule by manufacturing defect-free product.
Achieved generation of Business Analysis and MIS for information flow to top management enabling them to formulate business strategies.
Assistant Manager Production
March 1994 - June 2004
Company Name Videocon International Ltd
Presently working with leading appliance manufacturer
Job Profile
Controlling 17 Injection moulding machines inhouse, around 10 machines at vendors, 2 machines in Appliances Division.
Responsible for operations and output of the plant.
Co-ordination with the final assembly of Television.
Responsible for quality, quantity and M/c utilization.
Controlling 90 workmen with a team of 9 Engineers.
Co-ordination with outside vendors.
Technical assistance to Vendors
Settlement of cycle time and quality norms with vendors.
Worked with Gas Assisted Moulding.
Production Supervisor
Oct 1993 to March 1994
Company Name: Ador Polycontainers
Job Profile
Looking after production of 200 Liters Barrels for Chemical storage.
Managed the production of 200 liters barrels for chemical storage.
Optimized production process by Manpower Reduction on the machines, reducing consumable cost
Production Supervisor
Aug 1992 to Oct 1993
Company Name: Universal Luggage Mfg Co. Ltd
Job Profile
Led the initiative across process settings & optimization and resource optimization for the product line of moulded luggage.
Responsible for testing finished products as per IS standards.
Handled Windsor 800 machine
Moulding officer
August 1989 to July 1992
Worked with Universal Luggage Mfg. Co. Ltd. Waluj, Aurangabad.
Job Profile
Handled 1750 Ton and 1250 Ton machines. Was responsible for production and material reconciliation.
Seeking senior level assignments in Production/Process Engineering /Project Coordination and Testing with an organization of repute
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com