Post Graduate Diploma In Plastics Testing And Conversion Technology From CIPET, Lucknow In 1999-2000.
B.Sc From Rohilkhand University Bareilly In 1998
Having Hand Experience in Injection Moulding, Blow Moulding Machine and use the Various materials such as LDPE, LLDPE, HDPE, PP, PPCP, GPPS, ABS, HIPS, SAN, PET, PBT, POM (delrin), PC, PA, FRP, Nylon6, & 66. CPVC, uPVC, TPR Rubber,
Handling and manage of above 350 manpower in shift.
Monitoring production entailing, daily mould change and keeping control over activities and analysis process for stabilization thereby ensuring smooth operation. of 86 injection moulding m/c 38 socketing M/c, 6 assembly line.
Handling and planning of 635 product, and 435 mould.800MT MATERIAL CONSUPTION.
Handling Quality control on line and process stabilization through remove the variable factor from m/c, mould, material and add. the value of Engineering
Asst. Manager Production (IMD –u PVC)
Since March 2008
Reporting to:- Unit Head
Company Profile: Manufacturer & Exporter of UPVC, PP-R, CPVC Piping Systems.
Sr. Engineer
Nov. 2004 - Feb. 2008
Reporting to: G.M. (Operation)
Company Profile: A professionally managed public limited company engaged in the business of PET containers/ bottles/ jars for diverse applications in FMCG/ Confectionery/ Pharmaceutical Industries.
Engineer
March 2000 - Nov. 2004
Dynamic Industries
Company Profile: Manufacturer of Automotive Injection Moulding Component for Maruti, Honda siel LG. and Whirlpool.
Core Competencies:-
Production Planning and Control:-
Planning Day to Day achievements, production schedule, implementation 5S tools and allocation work for achieving for monthly Target.
Monitoring production entailing, daily mould change and keeping control over activities and analysis process for stabilization thereby ensuring smooth operation.
Co-ordinate with R&D Deptt. And provides feed back on market requirement to initiate new product development .
Process Engineering:-
Plan Raw material for process requirement for subsequent production with process parameter adjustment during mass production.
Interact with QA during Quality issues.
Preparing mould for repair and follow up all activities with tool room.
Preparing report, entailing daily production status report mat. Scrap, weekly m/c productivity reports
Cost saving initials:-
Implementation of inventory control measure so reduce absolute stock keep tab on slow moving item and achieve reduction in inventory management cost.
Q A:
Execute QC tools for process engineering and working towards zero defects by implementation SPC/SQC.
Implementation of latest tools like TPM/TQM ,5S, and Six Sigma activities and execute process enhancement project.
Establishing QC Standard and implementing QC system.
Man management:-
Conducting training program time to time to enhance the skills of the sub ordinate and as results gain improvement productivity.
Optimize shop floor manpower management with recruitment, training, and delegation of responsibilities.
Machine Used:
Injection Moulding Machine
Ferromatic Milacron sigma.110-150T, Omega-250T,350T,450T Magna-775T
CLF- 80T- 600T,1380T
FCS -HT100T, HT- 250T
EPM - 130T-180T
WINDSOR SP-80T -300T
Injection Stretch Blow moulding m/c – Nissae ASB 250T, 70DPH, ASB 50MB
Stretch (7) Blow moulding mic –sidel SBO 2.
To achieve and manage position in an organisation to use my skills and utilization my experience and achieve the target.
Seeking a managerial assignment in production, Planning & Control for conceptualizing and delivery, manufacturing, operational Excellence with organization of reputed plastic industry.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com