Ref. No. : CA - 10866 - (Production Planning - Plastic Products and Processing – with 32.5 years in Plastic Industry)

Education

Diploma of Associate Engineer (D.A.E) – Mechanical
From Govt.College of Engineering and Technology, Hyderabad, Pakistan. in 1987 With 1st Division

S. S. C. From Govt. High School, Kakar, Dadu
in 1983 With B Grade

Skill Sets

PEOFESSIONAL COURSES: 
FMEA (Failure Mode & Effect Analysis)
Supervisory Skills
Business Communication Training & Development Program
Improving Enterprise Competitiveness ILO – toolkit
Production Cost Reduction & Control Techniques

FOREIGN VISIT: 
Visited 06 times to Korea, Taiwan for development of new products & machine inspection.

COMPUTER SKILLS: 
Languages:  Dbase, C, Visual Basic 6 ( Data base & Active X control ) 
Software: MS Office Suite 2007, MS Internet Explorer, MS Visio, Fox-Pro.
Operating Systems: Dos, Windows 9x, XP, 2000, Vista.

Work Experience

Production Manager
Since Nov 2011
Company Profile: Dental Care & Baby Care Products manufacturing company in Pakistan
Job Profile:
To complete production targets in time with minimum non conformances.
Maximum capacity & manpower utilization.
Analyze process rejection and usage of recyclable material
To motivate personals towards cost saving and improvements
Plan trainings for improvement in floor management, improvement in aesthetic look, health & safety and for environmental issued. 
Focus on FGS stock to plan products for continue supplies as per sales requirements
To develop Energy saving awareness in organization

Dy. Manager Production
Dec 1999 To 2011
Company Profile: Innovative household appliance manufacturer
Job Profile:
Analyze scrap data to identify and correct manufacturing problems.
Ensure production area meets or exceeds labour standards.
Schedule production requirements.
Update PFMEA and conduct 8D problem solving techniques as needed. Handle all customer complaints. 
Ensure production area is supplied with needed WIP & purchased components. 
Provide continuous improvement ideas and to conduct Continuous Improvement projects.
Maintain ISO 9001 & 14001. 
Worked along with project engineer.
Cost reduction and continuous improvement projects. Testing new materials along dealing with customer complaints and quality issues. 
Involve in mold setting machine start up including mold & machine trouble shooting.
Completed various projects including technical support for outsourcing of plastic parts, improvement of working efficiencies through reducing mold change time, reducing process cycle time, improvement in screw design, reduction of electrical consumption by optimization of pumps operation through variable speed drive etc.
Trained in Statistical Process Control and the Seven Steps to problem solving
Trained in KanBan 5S Kaizan Events
Completed hands on training on injection and blow molding
Achieved smooth launch for refrigerator, washing machine, appliance molds. 
Involved & assisted R& D for alternate mold designing & development from Korea, Taiwan & China.

Production Manager
1991 To 1999
Company Name: Blow – N – Blow Plastics
Job Profile:
Provide process engineering technical support to production units in order to address and resolve any system, process or mechanical issues that cause efficiency loss 
Provide injection molding process support to plant engineering activities involving preparation and execution of detailed engineering projects 
Design improvements relating to capacity, efficiency, process safety and environmental performance 
Investigate and identify new technology requirements for ongoing injection molding improvements 
Interpret customer requirements and specifications and include them in equipment
Effectively trained 8 technicians to troubleshoot by precisely monitoring molding
Resolved customer quality issues and provided corrective actions to reduce scrap
Reviewed part designs, mold designs, mold flow analysis and prepared specifications for mold analysis.

Professional Summary:
21 years hands own experience in production (injection molding & Blow Moulding) department. Computer literate, and equipped with all latest accessories, including leading role for 03 years on Washing Machine assembly line production.
Having experience in the installation of new plant of injection molding up to 3000T moulding machine and Corresponds with the concerned department and supplier during different stages regarding on time parts and material requirement.
Ensure that the installation should be on time and arrange all equipment, facilities, man power according to schedule. 
A team player and self-starter with proven success in accomplishing task in a timely fashion with minimal supervision & guidance.
Detail driven with good communication skills and proven success interfacing with customers, co-workers and suppliers.

ACHIEVEMENTS: 
Winner 

INTEREST & ACTIVITIES:
Reading Books and Magazines.
Internet Surfing.

Future Goals

Seeking a challenging professional engineering career in a Progressive Organization that will utilize my experience, education and proven abilities as well as allows upward mobility commensurate with achievement.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com