Ref. No. : CA - 12760 - (Production Planning - Plastic Products and Processing – with 21.3 years in Plastic Industry)

Education

Pursuing PGDBA (Operation Management) from Welingkar Institute of Management and Research, Mumbai.
B.Tech. (Polymer- Plastic Technology) from Amravati University, with First Division in 2003
Diploma in Plastic & Polymer Engineering from Govt. Polytechnic Amravati, with First Division in 2000

Skill Sets

NIL

Work Experience

Deputy Manager - Operation
Since May 2013
Company Profile: Leading manufacturer of edible oil
Job Profile:
Driving operational improvements, maximising the value of the asset base while ensuring control on operational cost.
Responsible for monitoring and continually improving standard of performance and quality within organisation
Handling technical issue related to filling, packaging, extrusion, stretch blow moulding & injection moulding Machine for all Plants in India.
Handling customer complaints.
Training and development activity.
Monitor spare part and material consumption.
Mould development activity.
Maintaining GMP in all plants.
Working knowledge of SAP.
Handling edible oil filling lines.

Production Executive
Feb 2010 to May 2013
Company Profile: Multinational Company Engaged in Business of Soft drink, Fruit juices and Mineral water, etc.
Job Profile:
Handling complete 600BPM Sidel PET bottle carbonated soft drink line including machine of Sidel make like SBO 20 Stretch Blow Moulding Machine, Labeller, Filler, Pelletiser and Crones make Shrink Wrapping Machine, etc.
Implementing TPM, Kaizen, 5S standards
Responsible for spare part management.
Planning and effecting preventive maintenance schedules of various equipments to enhance the equipment reliability and increasing machine up time.
Man management- Directing, leading & motivating workforce and imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.
Team Leader in Plant Improvement Workshop in 5S.

Highlights:
Efficiently reduced time of : Mould Changeover from 111 min to 86 min by performing offline activity.
CIP flushing time reduce from 46 min to 21 min.
By implementing successfully TPM Continuous Improvement project and CE matrix reduce blow moulding down time from 9% to 1%.
Increased filling temperature from 14 c to 25 c for fanta flavour and up to 18 c for other flavours .
By performing proper preventive maintenance and spare part management we increase mechanical efficiency from 60% to 90%.
Taken trial of CHEMCO make preform and Kris make label successfully and use in commercial production.
Implement successfully many kaizen activity on different machines.

Service Engineer
Feb 2007 to Feb 2010
SIPA Plastic Packaging Systems
Company Profile: It is a Italian multinational company, original equipment manufacturer of injection moulding machines And High Speed Stretch blow moulding machines (both Rotary and Linear) & Moulds for PET plastic Industries.
Job Profile:
Responsible for errection, installation, start up and commissioning of injection moulding machines and stretch blow moulding machines.
Handled troubleshooting and processing for both injection and blow moulding machines at costumer site.
New process development and setting for new material and moulds.
Managed trial of new moulds & materials.
Handled in-plant training for customer, customer complaints, etc.
Highlights:
Underwent beginners training program at SIPA Spa, Vittorio Veneto, Italy.
Taken trial of Sabic PET raw material successfully and use in commercial production.
Successfully installed and commissioned:
400 BPM stretch blow moulding machine independently.
48 cavities horizontal PET performs injection moulding machine.

Production Engineer
Aug 2003 to Feb 2007
Vidyut Metallics Pvt. Ltd.
Company Profile: Manufacturing of Safety razors.
Job Profile:
Handled day to day production planning & its execution on floor
Managed manpower (technical & non-technical staff) on Shop Floor.
Managed trial of different moulds and materials.
Looked after mould maintenance and troubleshooting to achieve 95% cycle time efficiency and cavitations efficiency.
Leading a team of production with respect to Quality and Utilization. Training the Staff to achieve the same.
Handled injection moulding machines such as LTM, Super Master, Nessai, Krauss Maffei, Asian Plastic Injection Moulding Machines and Multicavity Moulds.
Hands on Experience of Hot runner controller Yudo and Gamamflux.
Highlights:
Handled 20 injection moulding machine independently.
Gained qualitative experience on hot runner multicavity mould.

Future Goals

To Excel in a challenging and Quality environment where my knowledge and experience can be shared and enriched.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com