Ref. No. : CA - 7054 - (Production Planning - Plastic Products and Processing – with 29.3 years in Plastic Industry)

Education

PGD-PPT From Central Institute Of Plastic Processing Technology (CIPET)
B.Sc. From Utkal University, Bhubaneswar. Year of passing: 1993
High School From Board of Secondary Education, Orissa

Skill Sets

Independently Handling 20-20+ Injection Molding Machine With Team Of Junior Engg, 12 Years in all engineering plastic Exp In in all engineering plastic Industry, 2+ Years In SWR fittings Plastic Production
Rep And Maint Of Injection Molding Machine, Molds, And Various Type Of Utilities, Monthly Production Plan Etc

Work Experience

Asst. Manager –Production & PPC
Since July. 2007
Company profile- Company is an ISO 9001:2000 Company with multiple products like injection moulding Engineering plastic products, pump parts, engineering products.
Responsibilities:
Production planning control
Proper utilisation of M/c, Equipment & Manpower with minimum resources & minimum cost.
Monitoring of corrective action and their effectiveness over internal quality audit finding.
Make preventive maintenance schedule for mould.
To Produce Quality Product on Time.
Define targets For production.
Motivate to Subordinates towards Continuous Improvements.
Develop And Implement Production Techniques And process flow.
Coordination with M/c Maintenance, Tool Room, QA, Assembly & PPC to Get High Productivity. etc.
M/C Handled:- L &T, Windsor, Ferromatic Milacron, Electronica, Haitian –Total no-20.

Plant in charge –Production (Plastic Division)
From July 2005-July 2007
Bansal Utkarsh Limited- an ISO 9001:2000 Company with multiple products like injection moulding Engineering plastic products like (1phase & 3phase electric meter box, Phillips juicer parts, mcb for Havells etc), PVC PIPES & SWR Fittings, GI pipes, Iron Pipes, poles, High mast. BUL had successfully achieved the turnover of almost US $50 millions during the financial year 2007-08.
Responsibilities:
Production planning control
Proper utilisation of M/c, Equipment & Manpower with minimum resources & minimum cost.
Monitoring of corrective action and their effectiveness over internal quality audit finding.
Make preventive maintenance schedule for mould.
Participating in project review meetings for evaluating project progress & debottlenecking.
Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
To arrange the various training program for employee to up gradation and aware with the latest version.
Ensuring and Implemented the continuous Improvement to eliminate the poor quality waste & time saving.
Ensuring the Customer specific Requirement And Fulfill in the Process.
Design Production Quality Layout.
To Produce Quality Product on Time.
Define targets For production.
Motivate To Subordinates towards Continuous Improvements.
Develop And Implement Production Techniques And process flow.
Coordination with M/c Maintenance, Tool Room, QA, Assembly & PPC to Get High Productivity.
M/C HANDLED:- L &T, Windser, Ferromatic Milacron, Electronica –Total no-8

Plant in charge
From March 2001 to July 2005
S. N. Engineering- Mfgr of Godrej Refrigerater parts, Havells, Phillips juicer parts, 1phase & 3phase electric meter box for Avon, semi conducter, maharaja & mahashakti. Inverter parts for Luminous, helmet for Steel Bird, microwaves for Signora, jewellery & watch boxes, house hold articles for Clear line & many more job works.
Work Responsibility:- PPC & As head incoming inspection. Handling the production. deptt. comprised 60 workers. Assigning the works to workers Generation of MIR/CIR. Solving on line problems. Analisis of line rejection & rejection cost. Solving the workers related problems & getting the required jobs. Visual inspection of quality at the time of running production. Checking the packing of dispatch of components And also checking the components at the times of vendors inspection.
M/C Handled:- L &T, Windser, Ferromatic Milacron, Electronica, Demag, Haitian(China made) etc.- Total no.s m/cs-13

Sr. Engineer (Production)
From April 1999 to Feb 2001
Engineer (Production)
From Mar 95 to Apr 99
Notable Contributions;
Reduced Rejection Rate 4.5%~0.8%
Reduce Cycle Time average 5 sec for Each Mould.
Reduce product change time From 66 min To 35 min.
Manpower Reduction on the machines.
Reduced consumable Cost.
Increased plant Efficiency.



Future Goals

Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative environment.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com