Diploma with Mechanical Engineering 66% (1996)
Higher Secondary School Examination Passed with 52% in (1990)
Skilled in handling of man power and machine power in woven sack manufacturing unit.
Shift Manager
Since May 2006
Company Profile: Manufacture of polypropylene bags mainly used for cement packing and agro variety in Africa. Plant capacity is 3 million bags per month
Key Responsibilities
My main tasks was to bring up a system and work as a link between upper management and the lower management, thus ensuring targets are met.
Man power Handling.
Quality Control.
Preventive maintenance.
Production according to planning.
House keeping.
Reporting to management.
Machine Handling:
Starex Tape Plant (1400/120) & (700/90) Output 500Kg/Hr. & 150Kg/Hr.
Weaving M/C (LSL-6) . & (LSL-4)
Lamination Plant- Star linger (1500/90) Speed 120mtr/min
Printing M/C (4 station) Speed 110 mtr/min
Convertex M/C (adstar bag making M/C) 2Nos. Output- 60 bags/min
Recycle M/C – 100KG/Hr.
Automatic Cutting & stitching m/c-40 bags/min.
Manual Printing M/C (3 colour)- 30 bags/min.
Liner & Sealing M/C.(INDIAN MADE ) All machineries from Europe accept liner and sealing mchine and fully computerised.
Production Engineer.
From 2004 - May 2006
Company Profile:Leading manufacturer of woven sacks and bags
Responsibility includes
Production & maintenance of extrusion tapeline.
Maintaining Quality of Tape and Setting of parameters.
Manpower Handling.
Preventive Maintenance in belt drive, chain drive, pneumatic system, cheese winder for good quality bobbins & enhancing better running of machine.
Quality planning as per Loom requirement.
Reporting to head of department.
Production Engineer
From 1999 - 2001
Spin Packagin Ltd. Bilaspur
Responsibilities include same as above working maintenance, production related with tape extrusion line.
Production Engineer
From 2001 - 2004
PET Fibre Ltd, Daman (India)
Responsibilities include:
Production planning and quality control in tape extrusion line and circular weaving M/C.
Setting of fabric Size & mesh in weaving M/c as required.
Maintenance planning of weaving M/c.
Setting of Mesh in weaving M/c.
Machinery Handled: LOHIA- Tape-Plant – (Lorex 1200 & 1400)
LSL- 6 weaving M/c. (90 looms)
Becomes a Production Manager