Diploma in Mechanical Engineering from Adhiparasakthi Polytechnic College, Melmaruvathur, State Board of Eduction,Tamil Nadu in April-1989
80.00% (First Class)
Course on AutoCAD, Microsoft Excel.
Overall 23years experience in Plastic Industries (Automotive and other Engineering Plastic Industries)
Production & On line Assembly planning control
Strong problem solving, analytical and communication skills to attand the trouble shooting
A good team member and can lead teams with multiple tasks.
Good man management and Go - Getter Attitude
Quality conscious, flexible, excellent inter personal skills and customer focused.
Cycle time Reduction
Production and planning and control through ERP software
Cost reduction and continual improvement
Optimise production through modern technique
Value engineering
?ER P ,MIS and OEE datas for production, using HRMS software for attendance
Deputy Manager
April 2012 till date
Company Profile: Manufacture of writing instruments
Job Profile:
Execute production & on line assembly of pen assembly and packing,
cycle time reduction,
Attend the trouble shooting on molding parameters and assembly machines.
ISO-9001-2000 System Management Implementation and documentation.
setting robot (HI -MORE Japan- 3axis pick & place) for smooth function
Machine planning, assembly planning
Production planing (ERP) and control value engineering.
Auto assembling and online packing.
Machines Handled:
Haitian (85 Tonnes To 200 Tonnes)
Super Master Taiwan (50 To 600t) With Robot
Meiki Japan (up To 200t)
Kawakuchi Japan (Up To 360t)
JSW Japan
Nissei Japan
Ferromatic Milacron
L&t Demag
Windsor ( 50 To 300t )
Niigata Japan
Hwamda 500 China
Engel
Automatic material loading, color dosing (Taiwan make), hot runner system moulds, chilling plant, Mold temperature controller, auto material conveying system. automatic pen assembly machine, pad printing.
Production Executive
Nov 2004 to April2012
Company Profile: Manufacture of polymer flush tank and and flush tank exporters
Job Profile:
Execute production & On line Assembly planning
Cycle time reduction
Attend the trouble shooting on molding parameters
ISO-9001-2000 System Management Implementation and Documentation.
Setting Robot (HI - MORE Japan- 3axis pick & place) for smooth function
Production Planing (ERP) and control value engineering
Machines Handled:
Super Master Taiwan (50 To 600t) With Robot
Meiki Japan(up To 200t)
Kawakuchi Japan (Up To 360t)
Jsw Japan
Nissei Japan
Ferromatic Milacron
L&t Demag
Windsor ( 50 To 300t )
Niigata Japan
Hwamda 500 China
Engel
Automatic material loading, colour dosing (Taiwan make), hot runner system moulds, chilling plant
Production Engineer
Jan 1999 to Nov 2004
Plastronics (India), Manufacturer of plastic components for the following leading automobile ndustries:
SYC industries. Chennai
India Japan lighting Ltd. (IJL) Chennai
Mitsuba sical industries Chennai
Hanil lear Chennai
SundaramClyton, Chennai
TRW rane, Chennai
EXIDE batteries, etc.
Job Profile:
Production planning and control.
On line quality control.
Minimise rejection rate
Cycle time reduction
ISO-9001 system management implementation and documentation,
Achieve production targets with quality standard
Man power handling
Production Supervisor
Jan 1991 to Dec 1998
Company Name: Beejay Plasts
Company Profile: Manufacture of plastic Component’s for Godrej Hi Care LtdJob Profile:
Production planning and control
On line quality control
Man power handling
Minimise rejection rate
Cycle time reduction
Achieve production sargets with quality standard
Machine maintenance, mould maintenance
Apprenticeship training at Carriage And Wagon works, Southern Railways, Perambur, Chennai.
To take up a challenging Technical Career in a reputed concern like yours
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com