Ref. No. : CA - 7448 - (Production - Moulding – with 29 years in Plastic Industry)

Education

PGD-PPT From Central Institute Of Plastic Processing Technology (CIPET)
B.Sc. From Utkal University, Bhubaneswar. Year of passing: 1993
High School From Board of Secondary Education, Orissa.


Skill Sets

Independently Handling 20-20+ Injection Molding Machine With Team Of Junior Engg, 12 Years in all engineering plastic Exp In in all engineering plastic Industry, 2+ Years In SWR fittings Plastic Production Rep And Maint Of Injection Molding Machine, Molds, And Various Type Of Utilities, Monthly Production Plan Etc.

Work Experience

Assistant Manager – Production & PPC
Since July 2007
Company Profile: An ISO 9001:2000 Company with multiple products like injection moulding Engineering plastic products, pump parts, engineering products.
Responsibilities:
Production planning control
Proper utilisation of M/c, Equipment & Manpower with minimum resources & minimum cost.
Monitoring of corrective action and their effectiveness over internal quality audit finding.
Make preventive maintenance schedule for mould.
To Produce Quality Product on Time.
Define targets For production.
Motivate To Subordinates towards Continuous Improvements.
Develop And Implement Production Techniques And process flow.
Coordination with M/c Maintenance, Tool Room, QA, Assembly& PPC to Get High Productivity. etc.
M/C HANDLED:- L &T, Windser, Ferromatic Milacron, Electronica, Haitian –Total no-20.

Plant In Charge – Production (Plastic Division)
From July’ 2005-July 2007
Bansal Utkarsh Limited, An ISO 9001:2000 Company with multiple products like injection moulding Engineering plastic products like (1phase & 3phase electric meter box, Phillips juicer parts, mcb for Havells etc), PVC PIPES & SWR Fittings, GI pipes, Iron Pipes, poles, High mast. BUL had successfully achieved the turnover of almost US $50 millions during the financial year 2007-08.
Responsibilities:
Production planning control
Proper utilisation of M/c, Equipment & Manpower with minimum resources & minimum cost.
Monitoring of corrective action and their effectiveness over internal quality audit finding.
Make preventive maintenance schedule for mould.
Participating in project review meetings for evaluating project progress & debottlenecking.
Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
To arrange the various training program for employee to up gradation and aware with the latest version.
Ensuring and Implemented the continuous Improvement to eliminate the poor quality waste & time saving.
Ensuring the Customer specific Requirement And Fulfill in the Process.
Design Production Quality Layout.
To Produce Quality Product on Time.
Define targets For production.
Motivate To Subordinates towards Continuous Improvements.
Develop And Implement Production Techniques And process flow.
Coordination with M/c Maintenance, Tool Room, QA, Assembly& PPC to Get High Productivity.
M/C HANDLED:- L &T, Windser, Ferromatic Milacron, Electronica –Total no-8

Plant In Charge
From Mar 2001 - July 2005
S.N. Engineering, Chandigarh- manufacturer of Godrej Refrigerater parts, Havells, Phillips juicer parts, electric meter box for Avon, semiconductor, maharaja & mahashakti. Inverter parts for Luminous, helmet for Steel Bird, microwaves for Signora, jewellery & watch boxes, house hold articles for Clear line & many more.
Work Responsibility:-
PPC & As head incoming inspection. Handling the production department. comprised 60 workers. Assigning the works to workers Generation of MIR/CIR. Solving on line problems. Analysis of line rejection &rejection cost. Solving the workers related problems & getting the required jobs. Visual inspection of quality at the time of running production. Checking the packing of dispatch of components And also checking the components at the times of vendors inspection.

Senior Engineer (Production) - From Apr 1999 to Feb 2001
Engineer (Production) - From Mar 1995 to April 1999
ISP Automotives Pvt Ltd, Patiala
As Engineer
Reduced Rejection Rate 4.5%~0.8%
Reduce Cycle Time average 5 sec for Each Mould.
Reduce product change time From 66 min To 35 min.
Manpower Reduction on the machines.
Reduced consumable Cost.
Increased plant Efficiency.

Future Goals

To be General Manager of a reputed plant.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com