1990 - Post Graduate Diploma in Plastics Processing Technology from Central Institute of Plastics Eng. Tech. Ahmedabad With Second Devision
1989 - B.Sc. (PCM) from M.L. Sukhadiya University Udaipur Rajasthan With First Division
1986 - Higher Sec. School Exam from Board of Secondary Education Rajasthan With First Division
1985 - S.S.C. School Board of Secondary Education Rajasthan With First Division
Production Moulding, Qulity
Manager (Production)
Deputy Manager (Production)
Shift Engineer
Since Apr’ 1993
Company Profile: Leading manufacturer of plastic injection molded houseware
Job Profile: Hands on experience in procuring plastic molded parts for TV assembly and looking after maximum utilization of machines (TOSHIBA make capacity 550T to 850T & WINDSOR KMP-1000 series Capacity 300T) for production of TV cabinets, audio & cooler parts etc during shifts.
In depth knowledge on documentation relevant to ISO 9001: 2000, member of internal Audit team for ISO 9001 2000.
Been instrumental in working on machines of Windsor make capacity 300T- 800T & Italtech make capacity 1000T-1600T. Processing material mineral filled PP, HDPE etc.
Junior Engineer
Mar’ 91-Apr’ 93
Videocon International Ltd. Aurangabad
Operations’ Management / SCM
Implementing plans based on demand forecasts to ensure availability of the entire range of inputs. Ensuring suppliers meet service, cost, delivery and quality expectations as well as provide outstanding value in product technology and supplier innovation.
Managing planning of / Supply Chain for all input components / material from vendors for achievement of targets within specified parameters & meet organisational objectives.
Sourcing/ Vendor Management
Steering strategic sourcing through identification of cost effective vendors/suppliers for procurement with an aim of reducing cost while improving quality & reliability. Assessing performance of the vendors based on various criterions such as quality improvement rate, timely delivery, credit terms etc.
Cost Saving Initiatives/ MIS
Efficiently using inventory management system and procedure for effective stores management and inventory control for ensuring ready availability of materials to meet the production targets.
Implementing inventory control measures to reduce obsolete stock, keep tab on slow-moving items and achieve reduction in inventory management cost.
With hard work, zeal and creative urge, I wish to work with the technology giants and achieve greater heights of success for the organization I work for and for myself. I wish to be known as one of the best practicing professionals of the country some day.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com