Ref. No. : CA - 4359 - (Production - Extrusion – with 36.4 years in Plastic Industry)

Education

Diploma in Mechanical Engineering From V. Ramakrishna Polytechnic, Chennai.

Skill Sets

Good Team Player and Co-operative among other members.
Fast learner and easily adaptable to any kind of situation.
High commitment to organizational goals and objectives.
Flexible and has a capacity to organize any job in a systematic manner.
Good in communication and presentation skills.

Work Experience

Works Manager
Since Jun 2008 to till date
Presently working with a leading Manufacturer of PVC Windows & Doors.

Executive Engineer - Manufacturing
1993 to 2008
Worked with Salzer Electronics limited, Coimbatore.
Manufacturer of Rotary switches, PVC Cable Ducts & Special profiles, Load break switches & Toroidal Transformers.

Supervisor
1992 to 1993
Worked at ELGI Polytex Limited, Coimbatore.
Manufacturer of Nylon tubes, PU Tubes, LDPE, HDPE Tubes & Pipes & LDPE Films.

Engineer
1990 to 1992
Worked at ARC Field, Chennai,
Manufacturer of Injection moulding machine.

Shift in charge
1988 to 1990
Worked at Space tech plastics. Gummidipoondi, Chennai.
Manufacturer of RPVC Pipes & Fittings.

Areas of Specialization:
Standardization of Polymer related items using the vast knowledge of the Polymer Chemistry
Adoption of Value Engineering Techniques with more skill.
Automation and allied parameters suitable for Small and medium scale industry with background of larger ability and exposure.
Vast knowledge in rigid & flexible PVC compound formulation to suit the end property.
Trouble shooting of process problems in injection moulding machines.
Vast Knowledge in processing of all commodity, engineering & specialty plastics.
Costing of finished products.
Thorough knowledge in tool design and manufacturing of profile & Pipe extrusion.
Execution of new projects from project report preparation to productionising.

Main projects:
Worked as a very Key Player and Now heading the division for PVC profile extrusion & Injection moulding of plastic components.
Demonstrated the capability of making the Critical Profiles on the extrusion which goes for PCB mounting etc.
Introduced many innovative method of Operation for slotting related parameters.
Proved in a very short time on meeting ROHS compliance.
With Major thrust in Utilization and Optimization of Machinery, Process control techniques, desired results were obtained with introduction of much method without compromising quality at any point of time.
Working under the concepts of 5S, TPM.

Future Goals

To Serve for an organisation which expects teamwork & profit making with the introduction of new ideas and concepts.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com