PPO CIPET-2017. Pass
12th Bihar Board in the year 2016 55%
10th Bihar Board in the year 2014 51%
Fast learner, Adopt well to changes and pressures in workplace.
Work effectively with diverse groups of people proactively.
Self motivated and hardworking.
Ambitious and committed to excellence.
Ready to relocate anywhere.
Zero tolerance with quality.
Working in zero accident mode.
Following no excuses.
Creating profitable work scenario.
Root cause analysis on daily basis.
Good verbal and written communication skills.
Excellent in pursuing Leadership & Teamwork.
Continuous improvement
My machine my responsibility(Production, 5S, Quality)
Moulding Operator
From - February 2022 to till date
Company profile - Manufacturing wheel covers and AOL/Overlay logos.
Job profile - Coordination with planning department to achieve target production.
Monitoring of department as well as line.
Plan vs actual and rejection control responsibility of line.
Process troubleshooting and maintain efficiency of process.
(Mold set-up) based on plan.
Process Optimization and modification.
Kai zen, Pokey-yoke and 5s implementation on shop floor.
Daily red bin analysis
Maintenance of Robots and fixtures
Taking trials of different kind of bumper moulds
Handling machines from 450T to 3500T and as well moulds from 12T to 45T.
Optimizing mould change hours and machines start-up times.
Manpower handling 40-45 nos based on plan
Improving assembly output
Insuring parts produced with best level of quality
Co-ordination with tool-room department to short out problem in parts and also to improve quality
Providing proper training to operators and tool setters on regular basis
Co-ordinations with safety department and work towards to prevent accidents on shop-floor
ORGANIZATIONAL EXPOSURE
COMPANY PROFILE:-
WORKING EXPOSURE IN MOTHERSON AUTOMOTIVE ENGG. :-
Machine known; Ferromatic, LK, HAITAIN, ENGEL, NEGRI BOSSI
ROBOT known; ROBIS, WITTMAN, YASKAWA, ABB, WEMO
PRODUCTION TECHNICIAN
From - December 2017 to January 2022
Company profile - Specialists in large size injection molding, blow molding.
Job profile - To check customer order in upcoming months and plan machines with plant executive
To deploy manpower according to their skills
To train them for tool changes and machine operations
To change moulds and monitoring tool change times
To check moisture content of material before machine run
To run machine with standard parameters ensuring quality of products
To take responsibility of whole shift quality
Looking out assembly manpower in whole shifts and monitoring output of assembly,fitment and basic pad printing activities Testing new received material for mineral contents
Working with PC+ABS, PA6M20, PA66M15, PPM40
Nozzle changing activity according to moulds if required
Water circulation verification/connection from manifold to direct during mould changes according to mould and ensuring mould changes time at standard level of 20-30 minutes
Material preheating setup for next shift plan
Monitoring material loading/unloading closely to avoid material mix-up.
Making involving in skill assessments of manpower worked in my shift whole month
Performing level-1 layered process audits of maintenance, quality, paint shop, pad printing and store departments
Daily downtime analysis
Daily rejection analysis
Shift 5S responsibility of assembly and mould shop
Attending shift meetings of every shift start and discussion of problems and improvements.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com