Diploma in Plastic Engineering & Technology from G.P.A., Ambala in 2003(69%)
Intermediate in commerce with maths from S.G.R.R Dehradun.(56%)
Bhechlor degree in B.B.A (2008) (Correspondence)(65%)
Injection molding Machines ranging from 95 Tons to 3800 Tons of the make TOSHIBA
(ALL ELECTRICAL),UBE, JSW, Sperry Sound, JONWAI, CINCINNATI, L&T,WINDSOR etc with robotic
operation.
Operation, assembly and maintenance of Hot Runner Moulds, core actuated
Moulds, Three plate moulds, Multi cavity moulds.
Plant Head Injection Moulding
From - 2015 to till date
Company profile - Manufacturer of Plastic Packing Containers, Airtight Plastic Containers
Deputy manager
From - 2013 to 2015
Company profile -manufacturing injection molded Shaving razor,stationary cutter and all industrial blades etc.
Sr.Engg. injection moulding
2009 to 2013
Machino Plastics LTD
Sr. Production Engineer
JULY-2007 to OCTOBER 2009.
Sun vacuum formers pvt. Ltd
Job profile -
Looking after the overall activities of production. Execution of plan & meeting the production & rejection targets.
Initiate action to prevent occurrence of non-conformity & verify the implementation of recommended solutions.
Monthly review meeting and set goals on monthly and yearly basis.
Ensure activity according to Dept. objectives.
Ensure operational working as per budgeted norms.
Training & development of shop floor team & maintain discipline & 5S.
Initiate continual improvement by using quality improvement tools, RBA, Why Why Analysis, Kaizen Etc.
Interaction with vendors for their problems & improvements.
New mould & machine trials in our plant as well as out of plant.
Set targets for down line and monitor its effectiveness on daily basis.
Interaction with other departments and regular follow-up for decided task.
Six days training on 7QC TOOL
TPM FMDS
QUALITY CIRCLE
WHY WHY ANALYSIS
RED BIN ANALYSIS
5S
INTERNAL AUDITOR
ROCE
One week training on SMED.
Injection molding:
Responsible for successful implementation of planning, allocation of machines & achieving target production.
Conducting new mould trials.
Responsible for process set up and troubleshooting.
Responsible for improving productivity and reduction in down time.
Coordination among concern department like PPC, TCOL ROOM, Q, C, MAINT.
Production Engg:
Process Flow Sequence.
Monitoring & analysis for reducing daily rejection. & Process Sheet/Work instruction.
Cycle time study
Setting up new lines/capacity planning/line balancing.
Handover of all document/training to production deptt.
Planning and Man Management:
Planning and allocation of machines on daily basis as per production schedule.
Planning man power as per production schedule.
Providing training to operator and associates for up gradation and skill improvement.
Machines And Material handled:
Windsor ranging from 80 ton to 350 ton.
Cincinnati Sigma/ Ferromatic ranging from 50 ton to 910 ton.
Electronica: EPM-210
Haitian: ranging from 80 ton to 180 ton
UBE 2500,3150 TON & JSW 13OO,1600 ton.
L&T: Demag series ranging from 100 ton 500 ton.
Process all Type of Engg.and Domestic plastics e.g Derlin , ABS,NYLON PBT,SAN,PC.and
PP,PPCP HDPE,LDPE,etc
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com