Ref. No. : CA - 28269 - (Production - Blow Moulding – with 23.5 years in Plastic Industry)

Education

Plastic Technology Diploma From IERT Allahabad

Skill Sets

Experience A strategic planner with expertise in executing and managing high valued plants involving planning and resource administration, with a flair for adopting modern methodologies in compliance with quality standards

Experience in Production Planning & Control and Resource Management of Packaging (Specialized in EBM and Blow Molding
Plant Operations | Strategic Planning & Management | Production Planning & Control

Work Experience

Production Head
Since Apr 2014
Job Profile:
Expertise in Machine head opening and repairing
Trouble shooting of machines
Process setting
Machine modification
Auto de flashing expert
Mold Correction
Machine Maintenance
Rejection Control

Can Handle machines:
EBM- Kyung Won (Korea) Ferromatic, Blow star, Technique, Jihaung, SMC, Tongda, CMP
ISBM-ASB-50MB, PF, 70DPH, 12M
IBM-Jomar & Victor
IM-Arburg, Ferromatic, L& T, Electronica, Toshiba

Key Result Areas:
Production Planning & Control: Planning day-to-day strategies, budgets, production schedules for the assembly processes along with resource allocation and machine loading for optimum output; minimizing performance bottlenecks for high productivity with maximization of men, material & machine.
Assessing and rendering recommendations on overall equipment effectiveness (OEE); appraising the prevalent production systems/ processes, identifying loopholes if any and undertaking result-oriented measures for alleviating them and documenting the same.
Process Optimization: Deploying various methodologies to analyze various processes, recommending modifications to minimize escalations, reduce rejections, realize operational efficiencies, control variability & costs and reduce cycle-time.
Ensuring cost reduction by implementing new techniques and working on productivity improvement; coordinating with various departments for ensuring the accomplishment of production target.
Man Management: Directing, leading & motivating workforce and imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.
Working on succession planning of the workforce & shift management activities, appraising the member’s performance and providing feedback.

Significant Achievements:
Acted as a core team member of:
Installation of 04 Plastics Moulding Plants/Sub Plants
Conceptualized the idea of using LED lights to initiate energy savings; innovated the idea for low power consumption.
?Restored machinery and initiated production activities at the factory, simultaneously modifying the plan layout, generating facility developments for installing mould and machines.
Formulated budgets & utilized the raw materials for plastic material effectively, thereby reducing waste by 7-10%

Production Manager
2005 to 2014

Production Engineer
2001 to 2005
Company Name : Golcha Plastic Private Limited

Future Goals

A strategic planner with expertise in executing and managing high valued plants involving planning and resource administration, with a flair for adopting modern methodologies in compliance with quality standards

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com