Ref. No. : CA - 29133 - (Production Planning - Plastic Products and Processing – with 10.1 years in Plastic Industry)

Education

B.Tech in Electrical Engineering from Invertis University Bareilly U.P

Skill Sets

Courseware including Ms-Excel, Ms- Word & Power Point. And basic knowledge.

Communication – Deals with internal and external customers and colleague at all levels via telephone and email, to ensure successful communication via actively listening and probing and questions.

Team Player – Enjoys sharing knowledge and encouraging development of others to achieve specific team goals.

Work Experience

Production Planning and Control.
Since June 2016 to till date
Company Profile : An ISO 9001-2008 certified company which engaged in the manufacturer of molding items like cosmetics, Pharmaceutical, Lube Oil, container products.

Job Profile :
1.Maintain Production performance report which details about the downtime, production report, incoming issue and raw material consumption .
2.Schedule Production plan, work instruction and Control plan.
3.Maintain all reports and records related to production and maintenance of machine.
4.To involve in all engineering aspects such as process parameter of machine and process improve productivity and product quality related to product.
5.Expertise to solve electrical issue in blow molding and injection molding machine.
6.New mould installation, trials and prepare trial sheet.
7.Trouble shooting in existing product, machine and mold.
8.Man power handling and supervised Plant in respect of Production and other matter.

Production Engineer
Jun 2015 to May 2016
Company Profile:- Leading manufacturer formaldehyde chemical.

Summer Training
IFFCO AONLA
Jun 2014 to Jul 2014
Company Profile :- Indian Farmers Fertilizer Cooperative LTD.(IFFCO) is the largest fertilizer cooperative federation based in India which is registered as a multi-state cooperative society . IFFCO has been 37 ranked in top companies in India

Project
On Speed Change Of A Dc Fan By Using Temperature Sensore Automatically”
The main objective of this project is to speed change of a dc fan automatically by change in temperature.

Future Goals

Intend to build a career with leading corporate of hi-tech environment with committed and dedicated people, which will help me explore myself fully and realize my potential. Willing to work as a key player with team spirit in challenging and creative environment .

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com