I have passed B.E Mechanical from Institute of Mechanical engineering in June 2018. (Part time)
I have passed DIPLOMA (Mechanical) from Parul institute of engineering and technology in June 2010.
I have passed S.S.C. with 68 % from G.S.E.B. Gujarat in March 2007
MS OFFICE:- MS word, MS power point, MS excel
DIPLOMA IN AUTOCAD COURSE FROM HYPERSOFT TECHNOLOGIES AT VADODARA
Production & Process Shift In Charge
From -08/08/2013 to till now
Company profile - leading Manufacturer and Exporter of Micro Sprinklers, Plastic Impact
Job profile -
Coordinating and planning with marketing & Logistic team for Production Planning.
I am also core team lead for any line stoppage / Root causing analysis in line with industry Practices.
Directs departmental continuous improvement plans and activities.
Motivating & guiding the team to achieve the organizational and departmental goals.
Handle the Production, Machine maintenance and printing dept.
To attend everyday production meeting and reporting to production manager.
Managing a team of 22 nos members in every shift and handling, Calculating & distributing
As per Planning.
Develop Process improvements to effectively utilize machine and material to maximize production.
Achieve Zero defect at Customer end by improving vendors through proper training, process
Control & validation, sustenance and standardization.
To work and report and analysis on SAP.
To know lot wise material balance, Material transaction in SAP & online Batch closure.
Documentation of processes and work according to Bureau of Indian Standards (BIS).
If required, undertake root cause analysis and assist in scrutinizing mechanical failures by Involving in 8D projects.
The job includes solving problems with the help of Root Cause Failure Analysis by 5why, Cause and Effect Diagram. Also doing SOP review monthly.
Jr. Engineer
From - 01/08/2010 to 28/03/2013
Company profile - Manufacturer of kids toothbrush, medium bristle toothbrush & soft bristle toothbrush
Job profile -
CNC machine (zahoransky) operating and programming for drilling, tufting, or trimming process and also takes training of molding machine (vertical and horizontal) and sealing catting(hydro pneumatic press).
Responsible for development and implementation of plants preventive and predictive maintenance program and also responsible for establishing effective maintenance systems, standards and procedures
Oversee the implementation of prescribed quality standards and am also responsible for upholding the necessary documentations pertaining to entire installation, maintenance and operational work of the Department
Prepare reports and schedules to inspect the performance and capacity of existing machines and equipment, identify potential problem areas and recommend suitable solutions for the same.
Responsible for providing technical training and illustrative plant and material knowledge to the lower production staff and trainees.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com