Diploma in plastic technology (DPT) from Central Institute of Plastics Engineering & Technology (CIPET), Amritsar, Done in 2014.
PPC Planning and control, testing of toys as per IS 9873( part 1), and IS 15644:2006.
Knowledge problem solving tool like 8D, cause & effect diagram, why why Analysis.
Efficient knowledge in additive and compounding, pneumatic and hydraulic, electrical and electronics, about auxiliary equipment and jig & fixture.
Excellent in shop floor management, 5s, pokayoke, kaizen, 4m, FIFO etc.
Knowledge of plastics material, its properties and applications.
Basic knowledge of testing of plastics polymer as per standard of ASTMD.
Awareness of ISO 9001/2008, ISO/TS-16949:2009, ISO 9001/2015, IATF 16949:2016, TPM.
Knowledge of quality core tool APQP, PPAP, FMEA, SPC, MSA.
Expert in 7QC tool, measuring instrument, about audit, MS office, OPL, Quality Alert, AutoCAD designing and GD&T.
Excellent in handling of Ferromatic injection molding machine, Jag Mohan extrusion blow molding machine FORZA INJECTION MOULDING MACHINE and mold maintenance.
Daily Check Sheet Audit, Additional Activities
Quality Control
From - January 2019 to till now
Company profile - Manufacturer of wide range of battery operated toys bike,car,Jeep etc.All our products
Assistant Engineer
From - From June 2015 to December 2018
Company profile - leading global supplier of Automotive Components of system, their customer Maruti Suzuki, Auto Liv, Skoda, Volvo
Job profile -
Prepare all Inspection standard as per control plan & product drawing.
Part inspection of sheet metal part, blow molded part, injection molded part, PU foam molded part, machining part, welded part, coated part , painted part , assemble part, fabric , felt , TPO and PVC sheet, child part etc.
Responsible for NG part verification from assembly line and root cause analysis.
Responsible for record and status of GRN.
Maintain all documentation. ,Layout inspection as per drawing.
Sample Inspection as per Part Inspection standards of incoming material.
Maintain supplier performance report.
Responsible for MINUT OF MEETING with supplier for CAPA.
Monitoring Process plan rejections & take corrective actions.
Verification of MTC and PDI from supplier.
Training to manpower about shop floor management 5S, KAIZEN and develop skill.
Handle Quality of Plastics component from IQC to CUSTOMER END.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com