Present Job:Aug 2003 TO Till date as a Production Incharge
Responsibilities :
* Setting Parametrrs and Mould Changes
* Dispatch and Inspection The Production
* Fill All the ISO related documents
* Taking a trial of new mould
Previous Jobs :
1. Sept 2002 – AUG 2003 M/s. Verroc Engineering Pvt Ltd, Pune
As a Production Engineer
* Capable of handling of Mitsubshi 850T to 1300 T
* Handling overall shift activities
* Handle the workforce of 30 people
* Planning overall production
* Setting process parameter of Nylon, Polycarbonate, ABS.PP
2. Feb.99 – Aug 2002, in M/s. Videocon Export Ltd, A’Nagar as a Plastic Process Engineer
* Plastic Injection Mould Trials and proving.
* Setting process parameters for various types of thermoplastics for trials & for the production of different types of plastic components for Home Appliance products. Such as (Audio System. Television.Refrigerator.Washing Machine etc.)
* Planning of mould trails, production & execution.
* Mould approval with customers.
* Identification of New vendors for new products.
* Handled various types of Injection moulding machines of various tonnages.
* Setting high quality standards with Co markes.
* Active participation in Group activities such as kaizen, quality circle, house Keeping & ISO -14001.
3. March 1998 – Feb. 1999 HI-Tech Plast Container (I) Ltd, Pune as a Production Engineer
* Production Planning of various plastic containers for Asian Paints, Berger Paints
& Rajdoot Paints.
* Handled work force of 100 operators in three shifts, by scheduling & routing of jobs.
* Achieved production targets with very high quality norms.
* Process parameter setting for various plastic material.
* Mould setting on various Mafatlal Niigata Injection Moulding Machines ranging from 150 to 300 tons.
4. Sept. 1995 – March 1998, Videocon Appliances Ltd, Aurangabad as a Production Engineer
* Processing of various types of Thermoplastic material i.e. PP, ABS, HDPE etc.
* Handling of Injection moulding machines with latest technology like Tosiba 550T to 1600T & Chen Shong 50T to 1600T.
* Handled a work force of 50 operators with scheduling & routing of various Washing Machine components.
* Achieved production targets, with quality & cost effectiveness.