Bachelor of Science CSJM University 2022.
Inter School Passed From UP Board in 2015.
High School Passed From UP Board in 2012.
Good Knowledge of MS Office (Word, Excel, Power Point).
Good Knowledge of Photoshop and CorelDraw.
Quality Manager & Production Head
From -January 2020 to Till Date
Company profile - manufacturer, supplier and exporter of Drip Irrigation Pipe, Agricultural Irrigation Pipe, etc
JOb profile -
Maintain all Laboratories testing procedure according to product standard.
Prepare all documents according to BIS Standard.
Handle independently all type of Inspection procedure such as BIS Visit, ISO Visit, and CIPET Visit & Third party Inspection.
Handle Independently Project Inspection, GGRCL, GWSSB, PHED Visit & all documentation.
Daily online dimensional checking & Handle product mfg. & production procedures.
Incoming Raw material testing.
Resolution customer complaint.
Testing of finished product before dispatch.
Maintain BIS standards such as
14151 (Part 1&2) (Irrigation Equipment Sprinkler pipes).
17425 (Irrigation Equipment Quick Coupled Polyethylene Pipe and Fittings for Sprinklers Irrigation Systems).
4984 (Polyethylene Pipes for Water Supply).
13488 (Irrigation Equipment Emitting Pipe System).
12786 (Irrigation Equipment Polyethylene Pipe for Irrigation Laterals.
15351(Agro Textiles Laminated High Density Polyethylene (HDPE) Woven Geomembrane for Water proof Lining).
7903(Textiles Tarpaulines made for High Density Polyethylene (HDPE) Woven Fabrics).
IS 4985:2021(Unplasticized PVC Pipe For Water Supplies)
Production Head & QCI
From - May 2018 to January 2020
Company profile -Manufacturers of Pipes & Fittings, Industrial Sheets, Marine Products
Job profile -
Assisted with various plastics extrusion and molding technical support issues.
Contributed to new product development in collaboration with development teams.
Designed and implemented extrusion and production equipment installation and maintenance plans.
Prepared and submitted cost reduction and quality enhancement plans
Operate Extrusion Machine. Ensured process completion compliance with company quality policy and procedures.
Prepared and submitted project synopses to management on a monthly basis
Monitored molding process implementation to ensure smooth operation.
Evaluated mold process changes to reduce production process waste.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com