Ref. No. : CA - 6070 - (Dispatch Stores Logistics & Commercial – with 33.1 years in Plastic Industry)

Education

Appeared for second year BBA. Distance Education. 2007
Diploma in Mechanical Engineering Board of Technical Examination, Mumbai.
First Class ( 63 %) 1988 to 1991

Computer Knowledge:
Operating System : Windows XP.
Office Tools : MS Office, Star Office.
Other Packages : ESS, LMB, Lotus Notes, Design Packages - AutoCAD 2007, Pro/Engineer wildfire2.0, Catia v5 R17
CAD, Pro-E, Catia

Skill Sets

Production Planning, Maintenance.

Work Experience

Process Engineer
March 1997 to till date
Presently working with leading company
An ISO 9001:2000 company, involved in agri based product & machine development for their own use with large Infrastructure, R&D support, Marketing network, Plants spred all over India. Routine Activity
Effectively management of man, machine & resources.
Maintain the record of consumption.
Analysis the data for any deviation & initiate immediate corrective action.
Plot the machinewise preventive maintenance schedule & execute the same vigorously.
Maintenance of records like boiler logbook, turbine logbook, break down & preventive maintenance, machines history card, etc.
Maintenance Activity
Storage Capacity 2500 MD
Storage Condition Temp.- 60 Dec. F & RH - 40 %
Maintenance of gas burner assembly & accessories,
Maintenance of Blower,
Maintenance of bin, etc.

Process Engineer
July 1996 to February 1997
Worked with Texel Industries Ltd., Ahmedabad.
It is well known in oven sack & tarpaulines.I was handling technical persons for production optimisation & maintenance.
Job Profile
Planning & Execution.
Plan daily activity & achieve the defined target.
Maintain the quality as per defined specification.
Work on Time study & Productivity norms -
Preparation of details of time study
Benchmarking of productivity norms for every activity for optimization.
Activitywise planning for labour deployment & resource allocation.
Maintenance Activity
Tape Extruder,
Bobbin winder,
Looms,
Eyelet Machine,
Sealing Machine,
Lamination Machine,
Packaging Machine, etc.

Engineer
November 1993 June 1996
Worked Jain Irrigation Systems Ltd., Jalgaon.
It is well known in Plastic Industries. It is a primer in drip irrigation, micro irrigation, tissue culture etc. I was working in Polytube division. I was handling a team of engineers for production optimization & job development.
Job Profile
Planning & Execution
Plan daily activity & achieve the defined target.
Maintain the quality as per defined specification.
Job setting as per the requirement of customer.
Trials conduct of optimisation of productivity.
Maintenance Activity
Extruder & all accessaries in extrusion line,
Coil winders,
Dryers,
Utilities maintenance - Compressor based chilling plant, Cooling tower, Diesel generator, etc.
Other activities
Maintenance of record like shiftwise activity & production.
Maintenance of record about machinewise raw material consumption & wastage percentage.
Minimize the rejection percentage by system improvement.
Manage the first aid inventory stock required for daily use.
Manage the wastage grinding & palletising units & its general maintenance.

Assistant Engineer - Trainee (Mechanical)
October 1991 October 1993
Worked with Vasant Co-op Sugar Industry Ltd., Kasoda (Jalgaon).
Job Profile
Shift Activity -
Effectively management of man, machine & resources.
Attend break down maintenance & rectify it during the shift.
Optimisation of production during the shift.
Maintenance of records like Boiler Logbook, Turbine Logbook, Daily shift report, etc.
Maintenance Activity
During off season maintenance of all plant & machineries involved overhauling of IBR Boiler (Make Walchannagar/ Cap.- 20 TON),
Impulse Turbines (Driver for Can Crushing Mill),
Reaction Turbine (For Power generation/ Cap. 1.2 MW),
Crushing mill (Cap.-1200 MT/Day),
Diesel generator (250 KVA),
Centrifugal machines (Simens),
Different kind of pumps (like Magma pump, Vacuum Pump, Gear pump, Centrifugal pump, Multistage pump),
Compressor (Elgi Make),
Multijet Condensers,
Evaporators,
Spray pond, etc.
Machine modifications for performance improvement.
New machine commissioning for capacity enhancement.
Stock staking of centralised general stores.
Management of workshop activity.


Future Goals

Production Manager

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com