Ref. No. : CA - 10924 - (Maintenance and Service - Electrical – with 15.5 years in Plastic Industry)

Education

Master Of Business Administration (Operation Management) from M.S.University for distance education with 73% in April 2012
BE (Mechanical Engineering) from St. Xaivers Catholic College Of Engineering
with 80% in March 2010
HSCC from Carmel Higher Secondary School with 62% in 2006
SSLC from Carmel Higher Secondary School with 88% in 2004

Skill Sets

Software Expertise:
Operating System: Win9x, Win XP, Win Vista, Win 2007
Language & tool: MS Office, C, C++

Work Experience

Maintenance Engineer
Since August 2011
Company Profile: Automotive Part Manufacturer

Junior Maintenance Engineer
March 2010 - August 2011
Company Profile:Automotive Component Manufacturer

Job Profile:
Responsible for scheduling and implementing of preventive maintenance activity for all machines and utilities.
Machine Erection and Installation.
Trouble Shouting in Hot Runner, Injection Timer Controller, Chiller, Compressor, Diesel Generator
Working Knowledge in Main Panel Board
Electrical and Hydraulic circuit trace outing
Trouble Shouting in INJECTION Moulding Machines (Winsor, Haitian, Woojin Selex, Feromatic, L&T, Engel )
Update the equipment history cards for the machines.
Checking the stock levels of the key equipments monthly.
Maintaining cleanliness of premises.
Checking & calibrating the MMDs with relating to process parameters periodically as per schedule.
Reducing MTTR and increasing MTBF
Responsible for safety protection equipments functioning properly.
Maintaining and order the consumables spare of machines &utilities.
Checking of safety protection units functioning properly
Responsible for maintenance of SPMs (Special Purpose Machines)

Area Of Exposure:
High temperature ovens
Hydraulic power pack
High Tonnage Bridge cranes EOT
Automated cut to length unit (plastic)

Achievements
Down time of machines reduced over all by 2.5% by proper scheduling of maintenance activities.
Alter the idle DG to 500 rated Amps running one, By saving Rs.4000000 saving for the company
Played an active role in achieving zero accidents for the past 6 months in the plant.
Successful installation & commissioning of injection moulding M/C

PROJECT DONE:
Experimental Analysis of Gobar gas Injection in SI Engine has been performed during the period BE
Operational study performed in ford motors has been performed during the period of MBA

Future Goals

To share my valuable talent towards an achieving organization excellence and come up with a good position in a reputed organization which values individual’s contribution providing excellent opportunities and challenging work environment

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com