Ref. No. : CA - 23768 - (Maintenance and Service - Dies & Tools – with 16.1 years in Plastic Industry)

Education

B.A. From C.C.S. University, Meerut in 2013 with 44.54%

Diploma in Plastics Mould Technology From Central Institute of Plastics Engineering & Technology, Amritsar (Punjab) in 2009

H.S.C. From U.P. Board in 2010 with 59.66%

S.S.C. From U.P. Board in 2010 with 63.66%

Skill Sets

Skills-Continuous Improvement, Plastics Injection Molding, Rubber Injection Molding,ISO/TS 16949-2009, Kaizen, Engineering, APQP, Software Documentation, 5S, Lean Manufacturing.
Capable of Quickly Adapting to Challenging Environments. 
Flexible Motivated, Highly Organized and Committed Individual with Good Communication Skills and a Strong Aptitude to Learn New Technologies. 
Tool Room Moulds, Mould Maintenance, Plastic, Rubber Moulds, ERP System, Job Work in Market ETC.
Marketing parched of Factory manufactured Mold bases, Round Parts, Ejector Pins, Plates & other components

Programming & Operation of CNC-EDM, CNC Milling & CNC Lathe, Wire Cut EDM (Fanuc Controller).
Conventional Machining Lathe, Milling, Grinding, Pantograph, Drilling Machine, EDM Machine, EDM Drill, Mould Doctor, Mould Cleaning Machine ETC.
Calibration Digital Height Gauge 600mm (2D Height Gauge) Aditya Engineering Company, Profile Projector Model-PP300TE (Traceability) Accurate ETC

Knowledge of ERP Syst

Work Experience

Sr. Engineer Tool Room - Mould Maintenance
Since December 2012
Company Profile: Manufacturer of Anti-Vibrating Parts and Engine Mountings. customers are Maruti, Honda, Nissan And Toyota.
Job Profile:
Rubber compound Material (Polymer) EPDM, NBR, SBR, and CSM.
Implementation of ISO/TS 16949:2008Documentation, Process Control.
Internal Quality System Auditor. (ISO/TS 16949:2008).
Mould drawing preparation & other Tool Room records keeping.
Corrective preventive Action plan.
To carry out time to time on job trainings as per the requirement & system.
To ensure proper documentation off all tool room   records as per the system.
Responsible of skill develop to the sub ordinate by on job training.       
Responsibility for maintain 5S on floor.
Monthly MRM Tool Room Reporting.
Implementation of new techniques and improve the KAIZEN per month.
Preparation of work instruction, control charts.
Responsible for Manage of Mould/Tool History Reports & Job work Cost & Spare Parts/Material Cost Sheet.
Responsible for Mould Break Down & Material Required This Monthly Sheet.
8-10 Person Handling Tool Room Department.
Good knowledge about all tool room conventional machines.
Good Knowledge in labor handling and interested in R & D.
Per Month, 60 Mould Break Down & Preventive Maintenance.
Per Month, 30 Submerge Squeezing jig Break down & Preventive Maintenance.
Per Month, 50-60 Squeezing jig Break down & Preventive Maintenance.
Per Month, 40-50 Press In Fixture Break down & Preventive Maintenance.
New Mould Self Handling Trial.
Implementation of system at process and final stage.
Work in Process control.

Tool Room Engineer - Quality: Oct 2010 to Nov 2012
Jr. Engineer - Tool Room : Aug 2009 to Sept 2010
Company Profile: Manufacturer of variety of consumer products Remote controls, AC Control unit, Set Top Boxes, Tablet PC, Media Box, and Telephone Call Disconnect also self mould & Tool Mfg. Company. It is also ISO 9001-9008 Company. Customer are Onida, Toshiba, LG, DTH Cable, Hyundai, Kona, Videocon, Hitachi.
Job Profile:
Implementation of ISO/TS 16949:2009 Documentation, Process Control.
Internal Quality System Auditor. (ISO/TS 16949:2009).
Responsible for Inspection Report & Shop Floor Drawing work Sheet.
Responsible for Manage of Mould/Tool History Reports & Job work Cost & Spare Parts/Material Cost Sheet.
Responsible for Mould Break Down & Material Required This Monthly Sheet.
Responsible for Manage of Mould Process Sheet.
Preparation of work instruction, control charts.
Material planning & Requirement Analysis.
Monthly production & Rejection analysis.
Maintain required records of Raw material.
Corrective preventive Action plan.
Mould/Tool Parts, Core & Cavity, All Some Insert Quality Chuck.
35 Machining Handling Tool Room Department.
30-40 Person Handling Tool Room Department.
New injection Mould, Deco& PCB tools making as per component & Drawing.
Injection Mould maintenance Hot runner, three plate mould.
New injection Moulds costing & moulds maintenance costing.
To make a DWM (Daily work management) & documentation of all mould Record as per the system.
Routine Maintenance plan for existing mould.
To ensure the mould process control as per SMC (standard mould condition).
To facility and control timely mould making as per plan.
Trail of new mould as per plan. 
Ensure the proper material using in mould as per plan.
Trouble shutting at any stage of  mould making  and control the rejection
Implementation of new techniques and improve the KAIZEN per month.
Responsible for man power optimum utilization by proper& effective work in tool room.
Control the on time deliver mould to production.
Responsible of skill develop to the sub ordinate by on job training
Responsibility for maintain 5S on floor.
To carry out time to time on job trainings as per the requirement & system.
To ensure proper documentation of all tool room   records as per the system.
Four Mould Making Per Month, 100 Mould Break Down & Preventive Maintenance.
Five PCB Tool Making Per Month, Five Deco Tool Making Per Month.
Mould drawing preparation & other Tool Room records keeping.
Marketing purchase of Factory Manufactured Mold bases, Round Parts, Ejector Pins, Plates & other components.
Vendor Development and Internal Coordination like Co-ordination with Purchase Department.
Plastics Injection Molding Machining.
Plastics Component Material (Polymer) ABS, PP, PE, PC.
Good knowledge about all tool room conventional machines.
Good Knowledge in labor handling and interested in R & D.
Implementation of system at process and final stage.
Work in Process control.

Project Work
Two Plate Injection Mould for Motor Back Fan Back Cover

Future Goals

To utilize my technical Knowledge to achieve organization Goal, offer my hard work & sincere services on a long-term basis

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com