Ref. No. : CA - 13274 - (Senior Admin and Projects – with 30 years in Plastic Industry)

Education

B.Tech (Mech) from B.U in 1991.

Skill Sets

A competent professional with 19 years insightful experience in the areas of Production, Maintenance & Project Management.
Strength in production management and maintenance management including supervision of project teams.

Work Experience

Senior MPF Engineer
July 2012 to October 2013
Company Profile: Leading Engineering, Procurement Construction Management Consultancy services providers in India.
Job Profile:
Worked in alliance with reputed Japanese project management company for FIPL #2.
Worked Under Utility Package which includes installation & commissioning of 2000 TR chiller plants, VRV Systems, Dx Plants, 6260 Cfm Air Compressors, 3000GPM fire Pumps, 1500 GPM Potable water pumps etc.
Execution of HVAC, plumbing, fire fighting, Natural gas, Air compressor system.
Project planning & scheduling.
Project monitoring & control.
Bill checking & verification.
Construction supervision.

Project Engineer
July 2010 to June 2012
Company Profile: Dealing with residential, commercial properties.
Job Profile:
Preparation and implementation of MEP projects.
Managing and supervising MEP project teams.
Preparation and presentation of project status and reviews to top leadership.

Services Engineer
May 2007 – June 2010
Company Profile: Ascot Hotels & Resorts Ltd.
Operates projects in Real Estate, Hospitality, Retail and Wayside Amenities.
Job Profile:
Ensured that all electromechanical site activities are conducted under controlled conditions as per shop drawing, specifications & work plan.
Monitored the daily, weekly & monthly progress.
Executed the works according to latest approved revision of drawings & instructions of authorized authorities.

Asst. Production Manager
Dec 2003 to Apr 2007
Company Profile: Synergy Polyadditives Pvt. Ltd.
One of the leading manufacturers of Polymer Additives in India. PVC Stabillizer, Lubricants, Metallic Stearates, Impact Modifier, Processing AIDS.
Job Profile:
Led the production activities as per procured orders and planning of raw materials for the production of PVC Heat Stabilizers.
Managed Operations & Maintenance of plant and the machines such as Sigma Mixer, M.S Reactors with S.S Lining, Drum Flakers, Grinders, Steam Boiler, Thermic Fluid Heater, Rotary Vacuum Dryers etc.
Evaluated the capacity of machines and coordinated with the Production. Manager to decide the volume of production,selection of manpower, machine, material, grade & number of batches etc.
Conducted regular inspection of machines, replacement of old and spare parts, adjusting / resetting of equipment, day to day checking of electrical panels, electrical equipments, motors etc. In coordination with electric foreman and filling logbooks.
Prepared the Value Stream mapping and so plant layout for new developing unit and supervised the execution.
Monitored physical stock and inventory of raw materials & finish products and coordinated with the QC dept. to ensure quality standards.
Coordinated with sales dept about delivery of finished products as per the set deadlines.
Maintained records like Logbooks,Instruction Manual, Spare Parts Manual, Drawing of Parts, Circuit Diagrams, Machine Details and History of Machines.

Production Engineer
March 1996 to Nov 2003
Company profile: Drift Plast Corporation, Delhi.
Manufacturing and Suppliers Companies of PVC Drift Eliminator .
Job Profile:
Led preventive and breakdown maintenance activities.
Planned and controlled production activitiesof PVC HEAT STABILISERS; reconciliation of work orders, stocks takes and dispatches.
Prepared MIS reports example Machine Loading Plan, Plan VS Short fall action, stock reports, shift end reports etc.

Mechanical Engineer
Sep 1993 to Feb1996
Company Profile:API Industrial Corporation, Daman
Manufacture of Plasticizer, DOP, DIDP, DOA, DBP.
Job Profile:
Reported to GM-Operation, Supervised the Plant erection and later led the production of plasticisers DOP, DBP.
Supervised and monitored the plant erection with the coordination with erection contractors.
Prepared shifts, manpower and time bound production schedule.
Perform capacity planning and provide inputs regarding anticipated machine or manpower capacity issues
Steered operations and maintenance of Reactors, Thermic Fluid Heaters, Steam Boilers, Condensor, Cooling Towers etc.
Managed vacuum and pressure test of reactors and pipelines.

Production Management :
Responsible for the management and coordination of plant operations including machining, assembly, stores, tool-room and maintenance consistent to improve the facility’s performance in dispatch, inventory and throughput.
Assure attainment of business objectives and productions schedules while insuring product standards that will exceeds customers’ expectations
Initiate plans and processes which minimize manufacturing costs through effective utilization of manpower, equipment, facilities, materials and capital.
Implement manufacturing strategies and action plans to ensure that the facility supports Group strategic initiatives.
Ensured the implementation 5S, Lean manufacturing, KAIZEN , SPC, 7 Quality tools application for problem solving for the production unit.

Maintenance Management:
Develop, plan and implement goals and objectives for the maintenance department, prepares and administers internal policies and procedures relating to departmental program activities, interprets and explains applicable rules, laws and regulations to supervisors and others.
Directs, oversees and participates in the departmental program work plan, assigns work activities, operations and maintenance projects and programs, monitors work flow and project status,reviews and evaluates work products, methods and procedures, implements needed work process and automation improvements, and methods for improving customer service.
Studies and recommends procedures and practices to improve operational efficiency, evaluates alternatives for performing needed work including by contracting out services, attends project review meetings to evaluate progress of ongoing construction or maintenance activity system.

Future Goals

To become a Manager.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com