DIPLOMA SKB polytechnic Kanakapur, May 2003 Technical Education 709
SSLC Sri Nirvana Swamy Residential High School Kanakapur2000 Karnataka secondary education 307
Kaizen
5S
Problem solving for continuous improvement.
Awareness training of ISO/TS 16949 ISO 14001
Awareness training of Fire Fighting.
Basic Toyota production System.
Senior Engineer
From - 13.06.2016 to till date
Comapny profile - The leading Toys manufacturer
Job profile -
To control entire production activity.
Tracking quality Concerns / Issue open and conducting internal Production meeting to down the level.
Trouble shooting in Molding Process.
Analysis of the rejected parts, identifying root cause.
Corrective and preventive action for occurred rejections.
Process Improvement in Injection molding and in assembly Line.
To follow-up on implementation of company standards for products and processes during shift responsibilities.
Approval of First Part Article. Last part approval.
Planning Production Activity as per Production forecast.
Continuously seeking for reduce cycle time.
Productivity improvement both in assembly and molding.
Carry out Daily maintenance of injection molding machine.
Raising Purchase Requisition for production consumable and day to day production requirements.
Reducing wastages by effective planning.
Reduction in Labor and Consumable cost.
Tracking Corrective & preventive action for lot, line, rejections.
Machines handling Engel, Ferromatic, L&T, from 250T to 2500T capacity of injection
molding machine. Responsible of production and man power planning. Reducing
product changeover time, Implementation of kaizens, 5s. Training new operator and shift in charge.
Taking trial of new Mould trial,
Calculating machine capacity utilization.
Direct manufacturing process and procedure to archive goal of first run capability.
Determined suitable crew requirement scheduled employees and worked with human resource to meet changing production schedules.
Assessed manufacturing presses and recommended improvement to increase productivity.
Completed and submitted monthly and yearly reports to support executive decision making.
Implemented quality improvement changes to minimize product defect rates.
Implemented Program changes to identified and quickly resolve root cause issues.
Reviewed work for quality and compliance with company standard and design specification.
Addressed personal issues and scheduling conflicts promptly.
Directed key personal in correct production techniques to achieve required quality.
Senior engineer
From - 01.07.2014 to 31.05.2016
Comapny profile --manufacturing automotive components
Shift Incharge
From - 01.07.2011 to 30.06.2014
Kongovi electronics p ltd
Team leader
29.09.2006 to 30.06.2011
Tata auto components system ltd
Machine operator
1.05.2005 to 31.05.2006
Tafe India p ltd
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com